The DZL type biomass boiler developed by hengxin Beoller,withsingle-drum horizontal chain grate,using biomass pellets as fuel,is a new generation of high-efficiency and energy-saving boiler.lts fuel biomass is an ideal renewable energy source,which haslarge amount of output every year.It can replace the burning ofcoal,which not only reduces costs for enterprises,bring richeconomic retuns,but also realizing waste utilization andincreose farmers'income,ochieving the common development ofeconomic and social benefits.It also has the adwantages of fastboosting,high thermal efficiency and large heating area.
DZL type biomass boiler is a horizontal three-return water-firetube boiler.It adopts high efficiency,energy soving and intensifiedcombustion technology in the design to ensure the fullcombustion of fuel.The wolume of the furnace and thecombustion chamber is very large,which is conducive tocompletely burning and settlement of the fly ash.Dust coarseseparation steering chamber installed at the exit smoke window,which achieves the purpose of dust remowal,reduces theemission of pollutants in fue gas and makes it meet the nationalenvironmental protection regulaticns.
1、The use of threaded pipe heat transferimproves thermal efficiency and reducesenergy consumption.
2、The application of the membrane water wallstructure improves the heat transfer coefficientand effect and reduces heat loss.
3、The threaded pipe is placed inside boiler shell,low leakageand small heat loss of exhaust gas.
4、Advanced submerged arc automatic welding process isadopted for the longitudinal and circumferential weldsof the boiler to ensure the welding quality.
5、The tail flue is equipped with dust collector to ensure thatthe dust emission meets environmentalprotection requirements.
6、Highly automation level,with automatic water regulation,low water level interlock protection,high and low waterlevel alarm and other functions.
7、Advanced arch design,forming a distinct inverted "alpha" flame,Conducive to fuel combustion, fuel adaptability
8、Complete control and monitoring instruments,safe and reliable boiler operation.
9、The setting of the two-wing flue enables the flue gas smoothly enter into the front smoke box,making the temperature of the front tube plate be the same,and avoiding the crack of the tube plate caused bythe temperature stress.
10、Chain grate adopts new type of small scale-type grate,which adds a unique safety ring to make the grate stable and reliable,improving combustion efficiency.
Steam Boiler
| Model Unit | Rated Steam Capacity (t/h) | Rated Working Pressure (MPa) | Saturated Steam Temperature(℃) | Heat Efficiency (%) | Design Fuel | Max Transport Weight (Kg) | Max Transport Dimension L*W*H (mm) |
| DZL0.5-1.25-SCIII | 0.5 | 1.25 | 194 | ≥83% | Coal Biomass Fuel | 11000 | 3300*2000*2656 |
| DZL1-1.25-SCIII | 1 | 15000 | 5200*2100*2600 | ||||
| DZL2-1.25-SCIII | 2 | 23000 | 5650*2400*2700 | ||||
| DZL3-1.25-SCIII | 3 | 24000 | 5700*2600*2800 | ||||
| DZL4-1.25-SCIII | 4 | 29000 | 6850*2700*3200 | ||||
| DZL6-1.25-SCIII | 6 | 32000 | 6800*2900*3400 | ||||
| DZL8-1.25-SCIII | 8 | 35000 | 7200*3200*3800 | ||||
| DZL10-1.25-SCIII | 10 | 40000 | 7900*3400*5500 |








With 40 years of factory history,660,000 square meters of factory area,580 million total assets,500 +service team etc.hengxin Boiler guarantees the real interests of customersthrough national safety and quality inspection institutions at all levels.
With 336 production equipments and more than 300 production models,hengxin devotes itself to scientific and technological innovation and iscommitted to providing customers with the most energy-saving and efficientboiler equipment,and each boiler is directly exported by hengxin manufacturers,with higher cost-effective performance in the boiler market.
hengxin Boiler adopts the latest intelligent boiler cloud platform system,realizes the overall control of the boiler operation state,and truly realizes worry-free ideal state.
hengxin Boiler,as a high-tech boiler manufacturer,is dedicated to making boilerswith services of R&D innovation,design customization,production specialization,sales refinement,installation standardization,renovation proficiency,EPC project comprehensiveness.
Technical consultation in 30 minutes,clear plan in 2 hours,dispatchof engineers at home and abroad in 24-72 hours,free maintenancewithin 12 months since shipment.
Some products are available in stock.Boilers under 15 tons can be delivered in 15 days,boilers with 15-25 tons can be delivered in 20 days andboilers with 25 tons or more can be delivered in 35 days.