A latex glove plant is a heat machine that happens to make gloves. Every line dips thousands of ceramic formers per hour through coagulant, latex compound and leaching water, and then dries them in long multi zone ovens before the gloves are stripped, tumbled and packed. The ovens are heated by steam coils, the washing tanks and leaching baths are heated by steam, and the plant runs around the clock, because a stopped line leaves wet formers, gelled compound and a restart that costs more than the break saved. Steam is therefore the one utility a glove plant cannot ration, and the boiler house sits at the front of the plant, not behind it.
Glove plants cluster in regions where natural gas is expensive or simply absent, and where wood chips, palm kernel shell and coal are cheap and close by. That combination points to a biomass chain grate boiler: automatic stoking, steady saturated steam, no operator at a fire door, and a fuel cost that keeps the plant competitive against gas fired rivals. Where the connected steam demand sits below about 4 tonnes per hour, a single drum DZL biomass boiler is usually the right machine. Large plants with six, eight or more dipping lines need the double drum SZL biomass steam boiler, a series rated from 4 to 20 tonnes per hour at 1.25 or 2.5 MPa with a heat efficiency of 83 percent or better.
This article follows the steam through a glove plant, explains why dry steam matters to a dipping line, works through the fuel and the sizing method, and lists the installation and maintenance habits that keep a SZL running clean beside a production hall that never stops.
Steam demand in a glove plant splits into one very large and continuous oven load and a set of smaller tank heating duties. The oven coils dominate, and they run whenever the line runs, which is close to 24 hours a day. The table gives planning values for a single dipping line producing in the range of 20,000 to 30,000 pieces per hour. Actual figures depend on the line length, the number of oven zones, the glove type and the ambient conditions, so treat them as a starting point for a steam balance rather than a fixed standard.
| Steam user | Pressure at the user (MPa) | Process temperature (degrees C) | Steam demand per line |
|---|---|---|---|
| Vulcanizing and drying oven steam coils | 0.5 to 0.8 | Air side 100 to 130 | 420 to 550 kg per hour |
| Coagulant tank and coagulant drying oven | 0.4 to 0.6 | 60 to 90 | 120 to 170 kg per hour |
| Former washing and rinsing tank heaters | 0.4 | 70 to 85 | 50 to 70 kg per hour |
| Leaching tank hot water | 0.3 to 0.5 | 50 to 70 | 70 to 110 kg per hour |
| Latex compound warming coils | 0.2 to 0.3 | 25 to 35, gentle | 30 to 50 kg per hour |
| Deionized water heating and CIP | 0.3 to 0.5 | 60 to 85 | 40 to 80 kg per hour |
| Feedwater deaeration | 0.02 to 0.05 | 104 to 110 | 20 to 30 kg per tonne of steam |
| Tracing, strip area, HVAC coils, canteen | 0.3 | Not critical | 100 to 200 kg per hour |
Three features of this load decide the boiler specification. The oven coils are the base line and they never switch off, so they set the minimum the boiler must carry around the clock. The tank duties are smaller but they are temperature critical, because coagulant that runs hot gels on the formers and leaching water that runs cold leaves protein residues, so each tank needs its own control valve and a stable header behind it. Finally, the line as a whole draws steam at or below 0.8 MPa, so a boiler working at 1.25 MPa with reducing stations at each group keeps the coils supplied with dry steam and keeps every bath at its setpoint without throttling the boiler itself.
Glove ovens are not exotic machines, but they punish wet steam harder than most industrial users. A steam coil flooded with condensate gives up part of its surface, the oven zone behind it runs cold, and the formers passing that zone come out undercured or with a moisture patch that becomes a defect at final inspection. The pairs below are the saturated steam values that matter at the user points of a glove plant.
| Gauge pressure (MPa) | Saturated steam temperature (degrees C) | Typical user in the plant |
|---|---|---|
| 0.2 | 134 | Compound warming, low temperature tracing |
| 0.3 | 143 | Leaching water, washdown, strip area HVAC |
| 0.4 | 152 | Former washing tanks, coagulant tank, CIP |
| 0.6 | 165 | Standard oven coil zones |
| 0.8 | 175 | Hot end oven zones, coagulant drying oven |
| 1.0 to 1.25 | 184 to 194 | Boiler outlet and main header before the reducing stations |
Running the header at 1.25 MPa and reducing at each group has three advantages on a dipping line. The pressure drop across the reducing valve adds a few degrees of superheat, so the coils receive dry steam even after a long run through the oven structure. Each oven zone and each tank gets the pressure its control valve was selected for, so a tank heating up does not steal steam from the ovens beside it. And the plant can log oven zone temperatures and steam pressures together, which is exactly the evidence a medical glove customer asks for during an audit.
A chain grate stoker feeds fuel from a hopper onto a moving grate, burns it in a controlled bed, and drops the ash at the far end, which is why one operator can run a boiler that a hand fired furnace would need three people to feed. The SZL grate handles a wide range of solid biomass and coal, and glove plants usually burn whatever the region supplies cheapest. The table lists the fuels seen most often, with the planning figures used for sizing.
| Fuel | Lower heating value as received | Moisture | Ash | What it means for the boiler |
|---|---|---|---|---|
| Wood chips | 14 to 16 MJ per kg | 25 to 35 percent | 1 to 3 percent | The baseline fuel, about 230 kg per tonne of steam at 83 percent efficiency |
| Palm kernel shell | 17 to 19 MJ per kg | 12 to 18 percent | 2 to 5 percent | Dense and free flowing, burns hot, watch grate speed down and bed temperature up |
| EFB and biomass briquettes | 15 to 17 MJ per kg | 10 to 15 percent | 3 to 6 percent | Steady feed through the hopper, keep the briquette moisture under cover |
| Rice husk | 13 to 14 MJ per kg | 8 to 12 percent | 15 to 20 percent | High ash needs a dust collector sized for it and a firm ash removal routine |
| Coal, for co firing or standby | 23 to 26 MJ per kg | 6 to 10 percent | 10 to 25 percent | Extends the range of the same grate, check local emission rules first |
An oven load is gentle and constant compared with a batch industry, which suits a chain grate well. The operating targets below keep a SZL on a clean burn with mixed wood chips; they shift modestly for shell and husk.
| Parameter | Working range | Reason |
|---|---|---|
| Bed thickness | 120 to 180 mm | Thin enough for air to reach the fuel, thick enough to hold ignition along the grate |
| Grate speed | Set so burnout ends before the ash door | Unburned fuel in the ash is a direct efficiency loss |
| Secondary air | 25 to 30 percent of total air, above the bed | Burns the volatile gases before they reach the tube bank |
| Oxygen in flue gas | 6 to 9 percent | Enough excess air for a wet fuel, not so much that stack loss climbs |
| Flue gas at boiler outlet | 160 to 200 degrees C | Above the acid dew point, below the point where heat is wasted |
| Fuel storage | Covered bay, two week stock, sloped floor | Every 10 percent of extra moisture costs roughly 4 percent of output |
Because the oven load barely swings, a SZL in a glove plant tends to sit at one steady firing point for whole shifts. That is the easiest duty a chain grate can have, and it is also why the commissioning week matters: the burn should be tuned once, properly, at the real operating load, rather than left where the test crew parked it.
Step one: rate the lines. Take the number of dipping lines and multiply by the oven and tank figures from the demand table. Eight lines at about 840 kilograms per hour each represent roughly 6,700 kilograms per hour of connected process steam.
Step two: add the balance of plant. Deionized water heating, deaeration at 20 to 30 kilograms per tonne of steam, tracing, strip area services and the canteen typically add 400 to 600 kilograms per hour on a large site.
Step three: apply a diversity factor. Not every tank peaks at the same moment, and line services overlap unevenly, so a factor of 0.85 on the connected total reflects a plant where the ovens are flat but the tank duties are staggered.
Step four: apply a margin and choose the model. A margin of 10 percent above the diversified peak covers fouled oven coils, a cold start after maintenance and the next line the owner is already negotiating for. Then pick the smallest standard model above that figure.
Eight lines at 840 kilograms per hour give 6,720 kilograms per hour of connected process steam. Deionized water, deaeration, tracing and plant services add 480, for a connected total of 7,200 kilograms per hour. The 0.85 diversity factor brings the expected operating peak to 6,120 kilograms per hour, and a 10 percent margin lifts the design point to about 6,700 kilograms per hour. The comparison below shows how the choice lands.
| Option | Configuration | Peak coverage | Comment |
|---|---|---|---|
| A | One SZL8 unit | 8 t/h, about 84 percent load | Covers the peak, but leaves no room for fouled coils or a ninth line |
| B | One SZL10 unit | 10 t/h, about 67 percent load | Recommended. Healthy margin now and capacity for one more line later |
| C | One SZL15 unit | 15 t/h, about 45 percent load | Only sensible where the master plan already shows 12 or more lines |
Option B suits most plants because the ovens hold the load flat, and a SZL running at two thirds of rating burns cleanly and wears slowly. An owner who cannot accept a single boiler on a plant that never stops should compare the cost of a partial standby unit against the price of one stopped shift, and decide with the steam balance on the table rather than after the first outage.
All six models share the same pressure, temperature and efficiency ratings, so the choice is a matter of output and of the transport envelope the site can receive. The figures below are the published data for the series.
| Model | Rated steam capacity (t/h) | Working pressure (MPa) | Saturated steam temperature (degrees C) | Heat efficiency | Design fuel | Max transport weight (kg) | Max transport dimension L x W x H (mm) |
|---|---|---|---|---|---|---|---|
| SZL4-1.25-SCIII | 4 | 1.25 / 2.5 | 194 / 225 | 83 percent and above | Coal, biomass | 23,000 | 6,300 x 2,300 x 3,200 |
| SZL6-1.25-SCIII | 6 | 1.25 / 2.5 | 194 / 225 | 83 percent and above | Coal, biomass | 25,000 | 7,700 x 2,800 x 3,450 |
| SZL8-1.25-SCIII | 8 | 1.25 / 2.5 | 194 / 225 | 83 percent and above | Coal, biomass | 27,000 | 7,800 x 3,100 x 3,520 |
| SZL10-1.25-SCIII | 10 | 1.25 / 2.5 | 194 / 225 | 83 percent and above | Coal, biomass | 30,000 | 7,900 x 3,300 x 3,640 |
| SZL15-1.25-SCIII | 15 | 1.25 / 2.5 | 194 / 225 | 83 percent and above | Coal, biomass | 40,000 | 10,000 x 3,200 x 3,500 |
| SZL20-1.25-SCIII | 20 | 1.25 / 2.5 | 194 / 225 | 83 percent and above | Coal, biomass | 45,000 | 11,000 x 3,300 x 3,500 |
The fuel figures below use wood chips at 14.5 MJ per kilogram and 83 percent efficiency, with steam taken at 1.25 MPa and feedwater at 25 degrees C. They are planning numbers: a wet fuel day or a fouled tube bank will move them by several percent.
| Model | Wood chips at full load (kg per h) | Consumption over a 24 hour day (tonnes) | Ash at 2 percent ash content (kg per h) |
|---|---|---|---|
| SZL4 | 920 | 22.1 | 18.4 |
| SZL6 | 1,380 | 33.1 | 27.6 |
| SZL8 | 1,840 | 44.2 | 36.8 |
| SZL10 | 2,300 | 55.2 | 46.0 |
| SZL15 | 3,450 | 82.8 | 69.0 |
| SZL20 | 4,600 | 110.4 | 92.0 |
The eight line plant from the worked example therefore burns roughly 37 tonnes of wood chips on a full production day, with the boiler house taking delivery of one or two truckloads every day or two depending on the region. The unit itself is a double drum longitudinal design with a membrane water wall, front and rear secondary air nozzles with separate control valves, divided wind chambers under the grate for even combustion across the bed, and a cloud based monitoring platform that lets the plant office watch the boiler from the production floor.
A dipping line lives on its oven zones, so the steam side deserves the same discipline as the latex side. Each oven zone should take its steam through a separator and a control valve, with a float trap sized for the real condensing load and a test valve that lets the operator prove the trap weekly. A failed open trap vents live steam up the condensate line and shows up as a boiler that works hard for the same oven temperature. A failed closed trap floods the coil and shows up as a cold zone at final inspection, which costs more than any trap ever will.
Condensate from oven coils and tank jackets is clean, hot and worth catching. Returning it to the feedwater tank saves fuel twice, once because the water arrives at 80 to 95 degrees instead of ambient and once because treated water does not have to be made and softened again. As a planning rule, every 10 percent of condensate returned saves about 5 percent of fuel, and a glove plant with a well kept return system typically recovers 60 to 80 percent of its steam as condensate. The return lines should be sized for two phase flow near the traps, pitched continuously, and kept away from floor washdown areas where gloves and chemicals are handled.
Most delay on glove plant projects comes not from the boiler but from the room around it. The checklist below reflects what a typical SZL installation needs before the boiler arrives.
| Item | Requirement | Note |
|---|---|---|
| Boiler house footprint | Model length plus 4 metres of operating aisle and crane height above the drums | Check the transport dimension table against the door and roof |
| Fuel bay | Covered, sloped, two week stock, truck access | About 2.5 cubic metres per tonne of chips |
| Steam reducing stations | One per pressure group, with separators and safety valves | Oven zones, tank groups and services logged separately |
| Water treatment | Softener sized for make up, chemical dosing, daily testing | Hard feedwater is the fastest route to a tube failure |
| Condensate return | Insulated return lines and a receiver tank near the oven hall | Every 10 percent of condensate returned saves about 5 percent of fuel |
| Chimney | Height and material per the local permit | Sampling ports for the dust collector test |
| Electrical supply | Grate drive, fans, pumps, panel voltage confirmed | 50 and 60 Hz versions available for export projects |
| Spares | Grate bars, gaskets, gauge glass, flame eye, trap spares | Kept on site from the first day of commissioning |
A glove plant runs every day of the year, so boiler care has to fit around production rather than wait for a shutdown. The calendar below spreads the work so that nothing waits for an annual window.
| Interval | Tasks | Purpose |
|---|---|---|
| Daily | Blowdown, water tests, gauge and level check, ash removal, grate and hopper walkround | Keeps steam dry and finds blockages early |
| Weekly | Safety valve try lever, trap test valves, stoker chain and gearbox check, dust collector emptying, economizer soot blow | Confirms protection and recovers flue gas heat |
| Monthly | Refractory and arch inspection, tube cleaning, instrument calibration, water wall leak check | Finds cracks and fly ash build up before they cost output |
| Annually | Statutory internal and external inspection, hydraulic test where required, efficiency measurement, oven coil group audit | Compliance and a baseline for the next year |
| Mistake | What happens | Better approach |
|---|---|---|
| Selecting the boiler on connected load with no diversity or margin | The unit runs at 95 percent from day one and the next line cannot be added | Apply a 0.85 diversity factor and a 10 percent margin, then choose the model |
| Skipping separators and traps on oven coil groups | Wet steam floods coils, zones run cold, defect rates climb at inspection | Separator, control valve and float trap on every zone, weekly trap tests |
| Storing fuel in the open | Moisture climbs, the chimney smokes, the grate cannot hold oven temperature | Covered bay with a two week stock and a sloped floor |
| No softener or no blowdown discipline | Scale on the tubes, higher stack temperature, tube failure on a plant that never stops | Softener sized for make up, daily hardness test, scheduled blowdown |
| Letting condensate run to drain beside the oven hall | Fuel and water treatment bills climb for no reason | Insulated return lines and a receiver tank, 60 to 80 percent recovery |
Usually a SZL10. Eight lines at about 840 kilograms of steam per hour each give 6,720 kilograms per hour of connected process steam, plant services add roughly 480 more, and the diversified peak lands near 6,100 kilograms per hour. With a 10 percent margin the design point is about 6,700 kilograms per hour, which a 10 tonne per hour unit carries at 67 percent load and can extend to a ninth line later. A four or five line plant should price a SZL6 or SZL8 instead, and a plant beyond twelve lines should talk about two SZL10 or SZL15 units.
Yes, the design fuel is coal and biomass on the same grate, and palm kernel shell is one of the most common fuels in glove producing regions because it burns hot and flows well through the hopper. EFB briquettes work well when they stay dry under cover. The grate area, the flame arch and the secondary air arrangement are selected for the fuel mix, so the plant should send the intended fuels, their analyses and the storage plan to the factory before the order. A documented fuel analysis is enough to finalize the design in most export projects.
An oven zone is only as good as its coil. Wet steam carries condensate into the coil, the flooded part of the surface stops transferring heat, and the zone behind it runs below setpoint, which shows up as undercured or tacky gloves at final inspection. Dry steam from a properly sized header, a separator at each zone and a working float trap keeps every coil at full output, which keeps the temperature profile along the oven flat and the defect rate where the quality plan says it should be.
Yes. Henan Hengxin Boiler Co., Ltd. builds to client drawings and adapts the furnace, grate, insulation, instrumentation and electrical supply to local conditions, including 60 Hz systems and non standard fuels. The company holds ISO 9001 and ISO 14001 certification and a special equipment manufacturing license, and supplies projects across Asia, Africa and Latin America. A general arrangement drawing, a fuel analysis and the site conditions are enough to start a quotation.
A glove plant sells by the piece, and every piece passes through an oven heated by the boiler house, so the steam plant deserves the same engineering attention as the dipping line itself. Send Henan Hengxin Boiler Co., Ltd. the number of lines, the line steam figures, the fuel analysis and the site conditions, and the engineering team will return a steam balance, a model recommendation and a boiler room layout. From a SZL4 for a compact site to a SZL20 for the largest estate, the SZL biomass chain grate boiler turns local solid fuel into the steady, dry steam a dipping line needs every hour of the year, and the application pages show how the same range serves the other industries that share these industrial parks.