WNS Gas Boiler for Cable Manufacturing Plants

November 20,2026    hxboiler    

A cable factory turns copper rod into finished insulated and sheathed cable through drawing, stranding, insulation extrusion, curing, screening and sheathing, and the step that decides product quality more than almost any other is curing. Rubber insulation is vulcanized inside a long pressurized steam tube, polymer compounds are warmed in jacketed mixers before they reach the extruder, and a pressure dip of a few tenths of a bar inside a curing tube can turn hundreds of metres of almost finished cable into scrap. Steam is therefore not a utility at the edge of a cable plant. It sits in the middle of the production line, at working pressures that most industries never see, and the boiler room has to deliver dry steam at a stable pressure hour after hour. This article works through the steam demand of a cable manufacturing plant, explains why the curing tube sets the design pressure of the whole plant, shows what steam quality means when steam touches the insulation surface directly, and sizes a gas fired plant around the WNS gas boiler range with a full worked example.

The worked example is a cable plant with two rubber insulated cable lines and one medium voltage crosslinked polyethylene line, plus a compounding area and the usual building services. The method is the same for any cable plant, and every number below can be rebuilt with the line count, tube lengths and compound throughput of the project the reader is planning. The typical industries served by this boiler family, including the polymer and chemical processing sectors, are listed on the chemical industry application page.

Why a Cable Plant Needs Steam at High Pressure

Most process industries live between 0.4 and 1.0 MPa. A cable plant does not, because curing is a temperature driven chemical reaction and the temperature of saturated steam is fixed by its pressure. To hold a curing tube at 205 degrees C the steam must be at about 1.6 MPa, and to reach 215 degrees C the pressure climbs past 2.0 MPa. The first task of the boiler designer is therefore an honest pressure map of the factory, not just a load map.

Process userSteam pressureTemperatureLoad characterWhat a shortfall costs
Rubber CV curing tube1.4 to 1.6 MPa195 to 204 degrees CContinuous during extrusion, sensitive to dipsUnder cured insulation, scrap cable, line stop
XLPE steam curing tube1.8 to 2.2 MPa210 to 220 degrees CContinuous, highest pressure in the plantCrosslink density below specification
Compound mixer jackets0.6 to 1.0 MPa165 to 184 degrees CBatch peaks when a mixer is chargedCold compound, poor extrusion surface
Warm water and degreasing tanks0.2 to 0.4 MPa110 to 152 degrees CShift based, moderateCleaning and pretreatment quality drops
Building heating, laboratory, cleaning0.2 to 0.3 MPa110 to 134 degrees CWeather and shift drivenComfort and hygiene issues only
Distribution and trap losses3 to 5 percent of connected loadConstantHidden shortfall on the coldest day

Two features distinguish this list from the load list of a normal factory. First, the largest consumers sit at the top of the pressure range, so the boiler plant must be selected for high pressure service even though the smaller users could live with much less. Second, the curing tubes are production critical: when they stop, the extruder stops, and every metre of cable inside the tube at that moment is written off.

The Curing Tube Sets the Header Pressure

A continuous vulcanization line, usually called a CV line, consists of a crosshead extruder followed by a long inclined steel tube, often 60 to 120 metres long, in which the freshly extruded insulation passes through saturated steam at line speed. The steam is the curing medium: it heats the insulation from the outside while the conductor carries some heat outward from the centre, and the crosslinking reaction needs a well defined temperature held for the residence time of the cable in the tube.

Why pressure is temperature

Saturated steam has one temperature for every pressure, and there is no way to cheat this relationship. If the process needs 213 degrees C, the steam inside the tube must be at about 2.0 MPa, and if the boiler room can only deliver 1.25 MPa, the tube will never see more than 194 degrees C no matter how long the cable stays inside. The table below is the ladder a designer works with.

Steam pressure (MPa)Saturation temperature (degrees C)Typical duty in a cable plant
0.4152Tank heating, cleaning water, warm rooms
0.8175Compound mixers, preheaters
1.0184Mixer jackets, older rubber lines
1.25194Standard rubber CV lines
1.6204Rubber CV lines, faster line speeds
2.0213XLPE steam curing tubes
2.5225Header pressure reserve above the highest user

The practical rule is that the header pressure must sit comfortably above the highest process requirement, because the tube, its valves and the distribution mains all lose a little pressure between the boiler and the point of use. In the worked example below the highest user needs 2.0 MPa at the tube, so the header is designed at 2.1 to 2.2 MPa and the boiler is selected in the 2.5 MPa pressure class, which is exactly the top of the WNS range.

Stability matters as much as the number

Crosslink density follows both temperature and time, so a temporary dip of 0.15 MPa inside a curing tube lowers the tube temperature by roughly eight degrees for as long as the dip lasts, and the cable extruded during that window is under cured. The causes are usually ordinary: a mixer charging at the wrong moment, a boiler that cannot modulate fast enough, or a header sized on pressure drop alone. The remedies are chosen at design time, and they are the reason the boiler count in this article is two rather than one.

Steam Quality When Steam Touches the Product

In a curing tube the steam is in direct contact with the insulation surface. That single fact moves steam quality from a pipework concern to a product quality concern, and it changes several habits that are normal in other industries.

Wet steam makes bad cable

Water droplets carried with the steam cool unevenly where they land, leave marks on soft insulation and, in the worst case, cause water hammer in the tube when slugs of condensate meet high velocity steam. Dry steam at the tube inlet is the goal, and it is achieved by three ordinary means: a steam separator with a drain trap at the header takeoff, correctly sized and maintained traps at every low point, and insulated pipework so the steam does not condense on the way to the tube. A dryness fraction of 0.98 or better at the tube inlet is a reasonable design target.

What the boiler water must never put on the insulation

Everything dosed into the boiler water can, in principle, travel with the steam. Filming amines, which are useful in closed heating networks, are normally avoided when steam touches a polymer surface, because the film can transfer and interfere with adhesion of subsequent layers. Oxygen scavengers and antifoams are chosen with the same question in mind: is this chemical acceptable on a product surface. The water treatment program for a cable plant boiler is therefore written together with the quality department, not copied from a generic boiler manual.

ParameterTypical targetReason in a cable plant
Steam dryness at tube inlet0.98 or betterEven cure, no surface marks, no water hammer
Boiler water TDSWithin maker limit, blown down on scheduleFoaming carries water and solids into the steam
Feedwater hardnessZero, softened or demineralisedScale slows heat transfer and dirties steam
Volatiles and filming agentsAvoided unless approved for product contactDeposit on soft insulation surfaces
Iron and silicaKept low by makeup treatmentCarryover builds deposits inside the tube

One more consequence deserves its own paragraph. Steam leaves the curing tube continuously at the end seals, and that exhaust steam carries curing by products from the rubber or polyethylene compound. It is not clean, and it is not recovered into the feedwater tank. The condensate return of a cable plant is therefore low, often 20 to 30 percent of the steam raised, and the feedwater tank lives mostly on cold make up water. The deaerator, the economizer and the water treatment capacity must all be sized for this reality, or the plant will run short of treated water on a busy day.

One Header, Three Pressure Levels

A frequent design question is whether to buy one high pressure boiler for the curing tubes and a second low pressure boiler for the mixers and heating. The simpler and cheaper answer is almost always one boiler plant at the highest required pressure, with pressure reducing stations for the lower levels. Throttling saturated steam through a reducing valve is close to constant enthalpy, so the steam arrives at the low pressure headers slightly superheated and very dry, which is welcome at mixer jackets and heating coils.

LevelPressure (MPa)Supplied toNotes
Header2.1 to 2.2Curing tubes through dedicated linesBoilers rated 2.5 MPa for margin
Level 21.5 to 1.6Rubber CV tubes, faster rubber linesReducing station with separator and trap
Level 30.8 to 1.0Mixer jackets, preheatersBatch peak damped by header volume
Level 40.3Tanks, heating, laboratory, cleaningWeather compensation on the heating circuit

Each reducing station gets its own separator, safety valve and downstream gauge, and the curing tube lines are fed directly from the high pressure header so that no reducing station can ever sit between the boiler and the highest pressure user. This arrangement also simplifies maintenance: the station can be overhauled on a shift change without stopping the curing lines.

Sizing the Plant: A Worked Example

Connected load

The example plant runs two rubber insulated cable lines and one medium voltage XLPE line, and its connected steam demand looks like this.

UserBasisSteam demand (t/h)
Rubber CV line 190 m tube, tube losses, end seal bleed and cable heating at production speed1.5
Rubber CV line 2Same basis, slightly shorter tube1.5
XLPE curing lineHigher pressure, larger tube, faster line2.0
Compound mixersTwo jacketed mixers, batch charging peaks0.8
Buildings, tanks, laboratoryHeating, cleaning and warm water0.4
Connected total6.2

Diversity and margin

All three curing tubes rarely peak together, because heat up happens once per shift change and steady production draws less than the start up peak, while the mixer batches are staggered by the compound store. A diversity factor of 0.72 reflects that reasonably, giving 4.5 t/h, and a design margin of 12 percent for fouling, trap losses and cold starts brings the design figure to about 5.0 t/h at the header pressure of 2.1 to 2.2 MPa.

Boiler count

With the design duty fixed, the choice becomes a decision about redundancy, and that decision should be made on production grounds: a boiler failure stops every curing tube at once, and the cable inside the tubes at that moment is scrap.

OptionConfigurationLoad at design peakIf one boiler failsAssessment
ASingle WNS6-2.5-YQ83 percentEverything stopsNo standby, rejected
BTwo WNS4-2.5-YQ63 percent eachSurvivor carries 80 percent, one line slowsRecommended
CWNS6-2.5 plus WNS2-2.583 and 25 percentLarge boiler down leaves 2 t/hPoor redundancy, rejected
DWNS4-2.5 plus steam accumulatorBoiler 80 percent with accumulator covering peaksLine stop until accumulator emptiesViable for stable, well metered demand

Option B is the usual answer for a plant of this size: two boilers of 4 t/h each sit at a comfortable 63 percent at the design peak, which keeps both units in an efficient part of their modulation range, and if one unit fails the survivor still carries four fifths of the demand, enough to keep the curing tubes alive at reduced line speed while the mixer and heating loads are shed. Option D suits plants whose demand has already been smoothed by a real energy management program, but the accumulator is a pressure vessel with its own inspection schedule, so most cable plants start with option B.

WNS Series Technical Parameters

The WNS range is a three pass, wet back, packaged fire tube boiler with a corrugated furnace and a generous steam space, which is exactly the behaviour a curing tube owner wants when a mixer charges against the header. The burner modulates across a wide range, the wet back construction keeps the rear door at a moderate temperature, and the packaged delivery shortens the installation to a foundation, connections and commissioning. The full specification sheet of the range is published on the WNS boiler specification page, and the model table below is taken from it.

ModelCapacity (t/h)Rated pressure (MPa)Saturation temperature (degrees C)Efficiency (%)FuelTransport weight (kg)Transport dimension LxWxH (mm)
WNS1-1.25-YQ11.0 / 1.25 / 1.6 / 2.5184 / 194 / 204 / 22593 to 98Natural gas, light oil, heavy oil55003300x1800x2200
WNS2-1.25-YQ275004000x2000x2950
WNS3-1.25-YQ380004350x2200x2600
WNS4-1.25-YQ4100004800x2300x2600
WNS6-1.25-YQ61.0 / 1.25 / 1.6 / 2.5184 / 194 / 204 / 22593 to 98Natural gas, light oil, heavy oil140005400x2500x2950
WNS8-1.25-YQ81.0 / 1.25 / 1.6 / 2.5184 / 194 / 204 / 22593 to 98Natural gas, light oil, heavy oil202266955x2480x2986
WNS10-1.25-YQ101.0 / 1.25 / 1.6 / 2.5184 / 194 / 204 / 22593 to 98Natural gas, light oil, heavy oil215006300x2700x3200
WNS12-1.25-YQ121.0 / 1.25 / 1.6 / 2.5184 / 194 / 204 / 22593 to 98Natural gas, light oil, heavy oil230006700x2700x3200
WNS15-1.25-YQ151.0 / 1.25 / 1.6 / 2.5184 / 194 / 204 / 22593 to 98Natural gas, light oil, heavy oil277007365x3200x3508
WNS20-1.25-YQ201.0 / 1.25 / 1.6 / 2.5184 / 194 / 204 / 22593 to 98Natural gas, light oil, heavy oil300008050x3750x3960

The model designation carries the design pressure, so the two boilers in the worked example are WNS4-2.5-YQ units: 4 t/h each at a rated pressure of 2.5 MPa, operating with the header at 2.1 to 2.2 MPa. This margin between rating and operation is normal for high pressure service and protects the plant against the pressure losses between boiler and curing tube.

Fuel Consumption and Annual Cost

At a header pressure of 2.2 MPa and a feedwater temperature of about 105 degrees C after the deaerator, each tonne of steam takes roughly 2,360 MJ of heat, and the figures below follow from the efficiency range of the WNS series. The low condensate return of a cable plant, explained above, means these figures are earned the hard way, from cold make up water, which is another reason the efficiency of the boiler matters more here than in a factory with 80 percent condensate return.

FuelConsumption per tonne of steamNote
Natural gas70 to 75 Nm3Reference fuel for the worked example
LPG54 to 58 kgWhere no gas grid exists
Light oil58 to 62 kgStandby or seasonal fuel
Heavy oil62 to 66 kgRequires heating and better atomisation

For the annual picture, the design peak of 5.0 t/h rarely holds for a whole shift; an average production day sits nearer 3.2 t/h, and 6,000 operating hours per year gives about 19,000 tonnes of steam. At 72 Nm3 of gas per tonne that is roughly 1.4 million cubic metres of natural gas per year, a number the reader can multiply by the local gas tariff to reach the annual fuel budget, and a number worth trimming by one or two percent through condensate management, insulation discipline and burner tuning rather than through lower boiler quality.

Plant Room Layout and Installation Checklist

A cable plant boiler room is ordinary by boiler standards, with one exception: the exhaust steam from the curing tubes must be led away safely, because it carries curing by products and it cannot be returned to the feedwater system.

ItemDesign note
Boiler room and doorsClear transport route for packaged boilers, WNS4 arrives at roughly 4800x2300x2600 mm and 10 t
Foundations and seatingVibration isolating seating, level check before lowering
Gas trainTwin stage regulation, metering, leak detection near the burners
Feedwater and deaeratorSized for low condensate return, 70 to 90 percent make up in a cable plant
Water treatmentSoftening or demineralisation, dosing approved for product contact steam
Blowdown and flash vesselScheduled blowdown with heat recovery to the feedwater tank
Reducing stationsOne per pressure level, each with separator, safety valve and gauges
Curing tube exhaustDedicated exhaust main with silencer, condensate and by product handling per local rules
InstrumentationHeader pressure and flow metering so diversity assumptions can be checked in service
CommissioningSteam quality check at tube inlet, pressure stability test under a mixer batch peak

Maintenance Calendar for a Cable Plant Boiler

IntervalTasks
DailyWater level checks, blowdown, gauge and burner readings, trap condition on the tube lines
WeeklyWater tests, safety valve exercise, filter checks, separator drain verification
MonthlyBurner tuning check, reducing station overhaul inspection, insulation walk down
AnnuallyStatutory inspection, tube cleaning, refractory and gasket renewal, control function proof

Five Mistakes Cable Plants Make With Boiler Steam

MistakeConsequenceWhat to do instead
Sizing on connected load without diversityOver sized boiler, poor part load behaviourBuild the diversity analysis and verify it with metering
Buying a 1.25 MPa boiler to save costCuring tube never reaches curing temperatureLet the highest process user set the pressure class
Returning curing tube exhaust to the feedwater tankBy products enter the boiler and the steamDedicated exhaust main, no recovery of tube steam
Generic water treatment with filming aminesDeposits on soft insulation surfacesTreatment program approved with the quality department
One boiler, no standbyEvery line stops together on a boiler faultTwo boilers at part load rather than one at full load

Frequently Asked Questions (FAQ)

Can a WNS fire tube boiler really work at 2.5 MPa?

Yes, 2.5 MPa is the top of the standard WNS pressure range, together with a saturated steam temperature of 225 degrees C. The pressure class is chosen per order, so a plant that needs a 2.2 MPa header orders the boiler in the 2.5 MPa class and operates below the rating. The three pass wet back construction is the same across the range, and the efficiency band of 93 to 98 percent applies to the whole family.

Why not install one low pressure boiler and one high pressure boiler?

Because the savings are usually negative. A second small boiler means a second burner, a second water treatment line, a second set of statutory inspections and a second operator training program, while a pressure reducing station is a fraction of that cost and needs almost no attention. One plant at the highest required pressure with reducing stations for the lower levels is simpler to operate and easier to keep documented.

How do we keep the steam dry enough for the curing tubes?

Three measures work together: a separator with an automatic drain at the header takeoff, correct trapping and insulation of the distribution mains, and a boiler whose large steam space and clean water chemistry keep carryover low. The commissioning test should include a dryness check at the tube inlet, and the weekly maintenance round should include the traps on the tube lines, because a failed trap quietly restores the wet steam problem.

What happens to the steam that escapes from the curing tube?

It leaves continuously through the end seals and the exhaust main, carrying curing by products, so it is vented and treated according to local environmental rules rather than recovered into the feedwater system. This is why cable plants run a high make up water percentage, and why the deaerator, economizer and water treatment capacity are sized on that basis from the first drawing.

A cable plant lives or dies by the stability of its steam, and the WNS gas boiler range was built for that standard: a pressure class that reaches the top of what curing tubes ask for, a large steam space that absorbs the mixer peaks, an efficiency band that holds up even with cold make up water, and a model ladder from 1 to 20 t/h that lets the designer buy redundancy instead of hope. Send the line count, the tube pressures and the local fuel situation to the Hengxin engineering team, and the reply will include the load table, the boiler count, the reducing station layout and the fuel figures at the local gas price, together with the draw based customisation and OEM options that the factory offers as a licensed manufacturer certified under ISO9001 and ISO14001.

RECOMMENDED PRODUCTS

  • 1Rated Steam Capacity(t/h)1-20
  • 2Rated Working Pressure(MPa)1.0-2.5
  • 3Saturated Steam Temperature(℃))184-225
  • 4Design FuelNatural Gas,Light Oil,Heavy Oil etc.
  • 1Rated Steam Capacity(t/h)0.3-4
  • 2Rated Working Pressure(MPa)0.7-2.5
  • 3Saturated Steam Temperature(℃))151-171
  • 4Design FuelElectricity
  • 1Rated Output(t/h)0.5-4.0
  • 2Rated Steam Pressure(MPa)1.0-1.6
  • 3Steam Temperature(℃))184-204
  • 4Apply FuelDiesel oil、Heavyoil、 Natural gas
  • 1Rated Heat Power(MW)10-120
  • 2Rated Working Pressure(MPa)0.7-1.0
  • 3Max Working Temperature(℃))290/320
  • 4Design FuelBiomass Fuel
  • 1Rated Steam Capacity(t/h)6-150
  • 2Rated Working Pressure(MPa)1.25-2.5
  • 3Saturated Steam Temperature(℃))194-225
  • 4Design FuelNatural Gas,Light Oil,Heavy Oil etc.
  • 1Rated Steam Capacity(t/h)4-20
  • 2Rated Working Pressure(MPa)1.25/2.5
  • 3Saturated Steam Temperature(℃))194-225
  • 4Design FuelCoal Biomass Fuel

Inquiry

Contact

Hengxin
Taikang Hengxin Boiler Co., Ltd. is located in Taikang County, Zhoukou City, Henan Province, the company was founded in 2016, is a specialized in boiler,pressure vessel products research and development, design, production, sales, installation, transformation and aseries of services. 7 years of development, Hengxin boiler has established a complete product line.The product line includes 8 kinds of oil and gas boiler, coal boiler, biomass boiler, hot blast stove, heat conductionoilboiler,electric boiler,waste heat boiler, circulating fluidized bed boiler,pressure vessel,28productseries,morethan 300models.Products cover agriculture,forestry,husbandryand fishery, food, textile, manufacturing, chemical, building materials, metallurgy and minerals, power supply and heating and many other industries. Hengxin Boiler,asone of the earliestenter prisesengaged in the boiler industry in China,was the first toobtain the B-classboiler manufacturing license issuedby the General Administration of Qua...