A tobacco redrying plant is one of the most sensitive environments in any heat using industry. Strip leaf arrives at the primary processing line with the aromas that buyers pay for, and every kilogram of that leaf passes through a dryer where hot air touches it directly. If the air carries combustion products, the leaf adsorbs the odour and the style of the cured tobacco changes in a way that grading and blending cannot undo. That single fact decides the heat supply: a redrying plant needs an indirect hot air furnace, one where the flame and the flue gas stay on their own side of a heat exchanger while clean process air is heated on the other. This article maps the heat users of a tobacco primary processing plant, sets out the temperature windows that curing and redrying actually run at, and works a complete sizing example on the WRF-Y(Q) series oil and gas fired hot air furnace range.
The scope is a single line redrying plant processing strip leaf at about 12,000 kg per hour on a two shift pattern. The figures below are realistic planning estimates drawn from tobacco processing practice; every project should confirm them against the actual line layout, leaf moisture schedule and local climate before a furnace is ordered.
Cured tobacco is hygroscopic and aromatic. Volatile compounds on the leaf surface equilibrate with whatever the surrounding air carries, so combustion odour, oil mist and flue gas acids all end up in the product. Direct fired heaters, the kind used freely for stone and aggregate drying, are excluded from leaf contact duty for this reason, and most tobacco quality standards treat taint from flue gas as a defect rather than a process variation. Indirect heating separates the streams: fuel burns in a combustion chamber, the flue gas sweeps through the hot side of a plate heat exchanger and out to stack, while process air passes through the cold side, is filtered and enters the dryer zones carrying nothing but heat.
The second requirement is temperature accuracy. Redrying schedules hold zone inlet air within a few kelvin of a set point, because colour, fill and moisture after the dryer all follow the zone curve. A furnace that drifts, or one that overshoots during load steps, costs quality that no later step recovers. The third requirement is continuity: a dryer trip in the middle of a production day leaves leaf standing in a warm, humid zone, and the schedule loses more than the furnace does. These three requirements, cleanliness, accuracy and availability, shape every selection decision below.
The table below lists the heat users of a typical single line plant. The dryer zones dominate the connected load, but the conditioning and workshop users set the floor load that the furnace must hold overnight and between batches.
| Heat user | Air or medium temperature | Load character | Consequence of a shortfall |
|---|---|---|---|
| Redrying dryer zone 1, high moisture section | Air at 90 to 100 degrees Celsius | Continuous during production | Moisture stays high, dryer throughput drops |
| Redrying dryer zone 2, main drying section | Air at 100 to 120 degrees Celsius | Continuous, largest single user | Final moisture above 12 percent, packing risk |
| Redrying dryer zone 3, cooling and conditioning section | Air at 45 to 60 degrees Celsius | Continuous, moderate | Poor fill, unstable moisture before casing |
| Conditioning cylinders before threshing | Air at 50 to 60 degrees Celsius | Batch, follows line start | Uneven lamina separation, high broken leaf loss |
| Workshop air handling make up air | Air at 30 to 45 degrees Celsius in winter | Shift based, climate dependent | Cold draughts, condensation on halls and ducts |
| Packing hall dehumidification regeneration | Air at 60 to 80 degrees Celsius | Continuous in humid seasons | Cartons and film pick up moisture, casing softens |
| Hot water for washdown and staff | 55 to 70 degrees Celsius | Shift based | Sanitation quality only |
Two observations follow. The connected load is dominated by one or two dryer sections that run at 100 to 120 degrees Celsius, which is a moderate temperature band that an indirect plate heat exchanger furnace reaches comfortably and holds without stress. And the floor load, the conditioning cylinders and workshop air that run before and after the dryer, is roughly a fifth of the peak, so the furnace needs a clean turn down rather than an on and off profile.
Tobacco processing runs a ladder of low and moderate air temperatures from the farm to the packed case. The table below collects the windows in one place, because a furnace supplier who sees the full ladder can propose one machine that serves the whole plant instead of a special unit for each zone.
| Process step | Air temperature window | Notes for the heat supply |
|---|---|---|
| Flue curing on the farm, yellowing phase | 35 to 38 degrees Celsius | Small barn burners, outside the scope of a plant furnace |
| Flue curing on the farm, colour fixing | 38 to 54 degrees Celsius | Fan driven, close control, again farm scale |
| Flue curing on the farm, stem drying | 54 to 68 degrees Celsius | Ramp rate limited, not load limited |
| Leaf conditioning cylinders | 50 to 60 degrees Celsius | Steam or hot air coils, batch duty |
| Redrying dryer, wet end | 90 to 100 degrees Celsius | Highest humidity, air must stay above dew point in the zone |
| Redrying dryer, main drying | 100 to 120 degrees Celsius | Peak connected load of the plant |
| Redrying dryer, cooling section | 45 to 60 degrees Celsius | Ambient air with limited trim heat |
| Casing and flavour application air | 50 to 70 degrees Celsius | Gentle air, uniformity matters more than temperature |
The whole plant ladder ends below 120 degrees Celsius of air, which is why the published outlet band of the furnace, up to 400 degrees Celsius at the top of its range, gives the plant more headroom than it needs. Headroom is worth having: it lets the same furnace serve an added stem drying line or an expanded pack hall later, and it keeps the burner in its efficient mid band instead of at maximum all day.
The comparison below sets a direct gas burner against an indirect plate heat exchanger furnace on the duties a redrying plant actually asks for.
| Aspect | Direct gas burner in the air stream | Indirect WRF-Y(Q) furnace |
|---|---|---|
| Contact of combustion products with leaf | Full contact, moisture of combustion enters the dryer | None, flue gas leaves through its own stack |
| Odour and taint risk on the leaf | Present, harder to grade and blend away | Eliminated by the separating wall of the exchanger |
| Air humidity control in the zone | Burner adds water vapour with every unit of fuel | Process air humidity depends only on the recirculation and vent schedule |
| Temperature stability across load steps | Fast but coupled to combustion noise and pulsation | Plate exchanger smooths the transfer, modulating burner holds within 2 to 3 K |
| Fuel flexibility | Gas only in most layouts | Natural gas or light oil on the published design fuel list |
| Efficiency at partial load | Good, but stack loss follows the excess air | Waste heat recovery option holds efficiency and saves 5 to 8 percent fuel |
| Maintenance exposure | Burner inside ductwork, access awkward | Unitised furnace cell, burner, fan and filter all reachable from the floor |
The honest summary is that direct firing is cheaper to buy and unacceptable to use on leaf. Every tobacco primary plant therefore builds on indirect heat, and the questions that remain are sizing, control and fuel.
The WRF-Y(Q) series is a unitised indirect hot air furnace. Fuel burns in a combustion chamber built around a heat resistant stainless steel core, the flue gas makes multiple passes through a plate heat exchanger, and process air is drawn through an air filter, heated on the clean side and delivered by the fan to the plant ducting. Nothing separates the flame from the air except the exchanger wall, and nothing but heat crosses it.
The exchanger arranges air and flue gas in a three circuit cross flow, which keeps the temperature difference along each wall high and the wall temperature itself moderate. The published description credits this layout with high heat exchange efficiency in a compact volume, and the practical benefit for a tobacco plant is steadier zone air: the exchanger does not chase the burner, so zone set points hold within a few kelvin while the load moves between sections.
Units fitted with the waste heat recovery device preheat incoming combustion air with the stack gas, which lifts the overall heat exchange efficiency above 90 percent and saves 5 to 8 percent of fuel against the base configuration. On a plant that runs two shifts and a half year long season, that saving pays for the option inside a few seasons, and the lower stack temperature also simplifies duct and fan selection behind the furnace.
The furnace core is heat resistant SUS304 stainless steel, welded inside a double layer steel skeleton, and the insulation layer is 150 mm thick. The insulation matters more than it looks in a tobacco plant: the furnace house is usually close to the processing hall, and a cool shell keeps the work area usable and the filtration air drawn from the house clean.
The control system modulates the burner across a furnace temperature range of 60 to 220 degrees Celsius with automatic high and low fire switching, and after shutdown the fan continues to run for 15 minutes to purge residual heat. The purge protects the exchanger and, just as important for the process, stops the last metres of ducting from baking any leaf that stands in the dryer when the line stops.
The range is published under the ZRFQ designation, rated in units of 10 thousand kilocalories per hour, one of which equals 11.63 kW. The table below reproduces the published parameters of the fifteen models. Rated heat power spans 60 to 4200 units of 10 thousand kilocalories per hour, roughly 0.07 to 4.88 MW, with outlet air at 100 to 400 degrees Celsius, atmospheric working pressure, and natural gas or light oil as design fuels. The furnace listed at the product page headline reaches 0.6 to 2.4 MW with a test thermal efficiency of at least 98 percent on the bench.
| Model | Rated heat power (10^4 kcal/h) | Approximate MW | Outlet air (C) | Efficiency | Fuel consumption, natural gas (Nm3/h) | Fuel consumption, light oil (kg/h) | Transport size L x W x H (m) |
|---|---|---|---|---|---|---|---|
| ZRFQ-5-YQ | 60 | 0.07 | 100 to 400 | at least 98 percent | 3.5 to 11.5 | 7 to 14 | 1.5 x 0.6 x 0.8 |
| ZRFQ-10-YQ | 120 | 0.14 | 100 to 400 | at least 98 percent | 10 to 28 | 13 to 26 | 2.6 x 0.9 x 1.2 |
| ZRFQ-20-YQ | 240 | 0.28 | 100 to 400 | at least 98 percent | 8 to 41 | 15 to 33 | 2.7 x 1.0 x 1.3 |
| ZRFQ-30-YQ | 350 | 0.41 | 100 to 400 | at least 98 percent | 8 to 41 | 15 to 33 | 2.5 x 1.1 x 1.45 |
| ZRFQ-40-YQ | 500 | 0.58 | 100 to 400 | at least 98 percent | 8 to 41 | 15 to 33 | 3.5 x 1.2 x 1.55 |
| ZRFQ-60-YQ | 700 | 0.81 | 100 to 400 | at least 98 percent | 20 to 85 | 20 to 75 | 3.5 x 1.3 x 1.65 |
| ZRFQ-80-YQ | 1050 | 1.22 | 100 to 400 | at least 98 percent | 30 to 120 | 30 to 90 | 4.0 x 1.4 x 1.75 |
| ZRFQ-100-YQ | 1200 | 1.40 | 100 to 400 | at least 98 percent | 5 to 150 | 35 to 110 | 4.0 x 1.5 x 1.85 |
| ZRFQ-120-YQ | 1400 | 1.63 | 100 to 400 | at least 98 percent | 50 to 210 | 67.5 to 177 | 4.0 x 1.7 x 2.05 |
| ZRFQ-150-YQ | 1750 | 2.03 | 100 to 400 | at least 98 percent | 50 to 260 | 80 to 220 | 4.9 x 1.8 x 2.2 |
| ZRFQ-200-YQ | 2400 | 2.79 | 100 to 400 | at least 98 percent | 90 to 320 | 100 to 290 | 5.2 x 1.9 x 2.3 |
| ZRFQ-240-YQ | 2800 | 3.26 | 100 to 400 | at least 98 percent | 50 to 360 | 80 to 329 | 5.6 x 2.0 x 2.4 |
| ZRFQ-300-YQ | 3600 | 4.19 | 100 to 400 | at least 98 percent | 100 to 450 | 120 to 360 | 5.6 x 2.05 x 2.5 |
| ZRFQ-360-YQ | 4200 | 4.88 | 100 to 400 | at least 98 percent | 100 to 450 | 120 to 360 | 5.6 x 2.1 x 2.6 |
| ZRFQ-400-YQ | 4200 | 4.88 | 100 to 400 | at least 98 percent | 100 to 450 | 120 to 360 | 6.0 x 2.1 x 2.6 |
The published application list of the series names food processing, automotive paint drying, breeding farms, chemical, building materials and paper industries among its users, and the application pages collect reference installations by industry. Tobacco primary processing sits naturally in the same family, because the duty, clean filtered air at a moderate and precisely held temperature, is exactly what the series is built around.
Size the furnace from the dryer heat balance, not from the dryer nameplate. The four steps below take the worked example plant from connected load to a model choice.
Strip leaf enters the redrying dryer at about 22 percent moisture and leaves the drying sections at about 12 percent before conditioning and cooling. At 12,000 kg per hour of leaf, the water evaporated per hour is 12,000 multiplied by 10 divided by 88, which is about 1,364 kg of water. Redrying practice, with the fan and vent load included, costs roughly 3,200 kJ per kilogram of water at this temperature band, so the dryer zones demand about 1,364 multiplied by 3,200 divided by 3,600, or 1,212 kW of delivered heat.
The conditioning cylinders take 150 kW, the casing air 180 kW, winter make up air for the halls 250 kW, dehumidification regeneration 90 kW and hot water 60 kW. The connected total is 1,212 plus 150 plus 180 plus 250 plus 90 plus 60, which is 1,942 kW.
Not every user peaks at once: the make up air load tracks winter while the dryer runs its production schedule, so a simultaneity factor of 0.85 is realistic for a two shift plant. The design load is 1,942 multiplied by 0.85, or 1,651 kW, and with a 10 percent margin for an added pack hall or stem line it becomes 1,816 kW.
| Option | Rated output | Duty point at 1,816 kW | Assessment |
|---|---|---|---|
| ZRFQ-150-YQ | 1.75 MW | 104 percent | Above rated output, no margin, rejected |
| ZRFQ-200-YQ | 2.40 MW | 76 percent | Comfortable mid band, burner modulates cleanly, recommended |
| ZRFQ-240-YQ | 2.80 MW | 65 percent | For a planned second line, higher capital, reserve option |
The ZRFQ-200-YQ carries the design load at 76 percent of rating, which keeps the burner in its modulating band through the day and leaves real headroom for the shoulder duties. A plant with a firm second line in its plan should price the ZRFQ-240-YQ instead, and the difference in capital is usually smaller than the cost of splitting the heat supply in two later.
The furnace is one part of the system; the air side decides whether the dryer zones see what the schedule asks for. Draw process air from a clean part of the furnace house, pass it through the filter stage on the furnace inlet, and keep the filter maintenance on a fixed schedule, because a blinded filter starves the fan and shifts the duty point without any alarm. Between the furnace and the dryer zones, use blending dampers at each zone inlet so the zone can mix furnace air with recirculated hall air, which is how a 120 degree drying zone and a 50 degree conditioning zone share one furnace. Instrument each zone with its own inlet sensor and let the zone damper, not the burner, carry the fast corrections; the burner should follow the furnace outlet temperature slowly, which keeps the exchanger thermally steady and the zone curves flat.
Insulate hot ducting with at least 100 mm of mineral wool and check the duct joints on the filter side of the system, because tobacco dust settles on every warm surface and a leaky joint spreads it. The shutdown purge of 15 minutes already protects the exchanger; a similar short run on of the dryer fans after a line stop keeps the zones from stewing the last leaf through them.
The series takes natural gas or light oil as design fuels, which covers the two supply situations a redrying plant usually faces: gas where the industrial estate has a pipeline, oil where the plant is remote or the gas connection is unreliable. The table converts delivered heat into fuel at typical efficiencies and prices that should be replaced with local contract figures.
| Fuel | Lower heating value | Fuel per MWh of delivered heat | Indicative price | Indicative fuel cost per MWh |
|---|---|---|---|---|
| Natural gas | 35.6 MJ/Nm3 | 108 Nm3 | 0.35 USD per Nm3 | 38 USD |
| LPG, where piped gas is absent | 46.0 MJ/kg | 85 kg | 0.65 USD per kg | 55 USD |
| Light oil | 40.8 MJ/kg | 92 kg | 0.70 USD per kg | 64 USD |
For the worked example plant, running 6,000 production hours a year at an average 70 percent of the 2.40 MW rating delivers about 10,080 MWh of heat, which is roughly 1.09 million cubic metres of natural gas before the waste heat recovery saving. The recovery device saves 5 to 8 percent of that, or 55,000 to 87,000 cubic metres a year, which at typical industrial gas prices is a substantial annual line item for one optional assembly.
| Item | What to confirm |
|---|---|
| Furnace house location | Upwind of leaf intake, clean air for the filter stage, service access on the burner and fan sides |
| Gas or oil train | Pressure and pipe size per the model data, double block and bleed on the gas train, oil pump and nozzle heater on light oil |
| Stack | Height and termination per local rules, condensate drain if the recovery device is fitted |
| Ducting and dampers | Zone blending dampers with actuators, insulation complete, test points at each zone inlet |
| Filter stage | Panel or bag filters on the process air inlet, differential pressure gauge with an alarm point |
| Controls interface | Furnace outlet control wired to the dryer zone schedule, remote start and stop from the line control room, alarm relay to the plant historian |
| Safety | Flame detection, purge interlock before ignition, high temperature cut out, emergency stop at the furnace and at the line |
A commissioning day that ends with each zone inlet verified against its schedule set point, the purge sequence demonstrated, and the filter alarm tested, is a commissioning day that prevents the three most common first season problems: drifting zones, a furnace that trips on start and a filter that blinds silently.
| Interval | Task |
|---|---|
| Daily | Log furnace outlet temperature, zone inlet temperatures, filter differential pressure, burner modulation and stack temperature |
| Weekly | Check flame signal strength, inspect the filter stage, listen to the fan bearings, test the interlocks |
| Monthly | Clean the filter stage as indicated by the gauge, inspect duct insulation and damper travel, verify the shutdown purge duration |
| Quarterly | Service the burner, check the gas or oil train valves, clean the fan wheel, inspect the exchanger access panels for dust build up |
| Annually, before the season | Full burner overhaul, exchanger internal inspection, repack gland seals, recalibrate zone sensors and the outlet controller |
Tobacco adds one habit to a normal hot air furnace calendar: housekeeping for leaf dust. The filter stage, the furnace house floor and the duct surfaces near the dampers collect dust that is both a hygiene and a combustible concern, and a cleaning routine tied to the daily log keeps both risks small.
First, sizing from the dryer motor instead of the heat balance: the fan ratings describe air movement, not heat, and the evaporation calculation above is the only sound starting point. Second, letting the furnace outlet carry the fast control: zones that chase the burner oscillate, and the fix is always zone dampers with a slow burner. Third, ignoring the filter stage until zones drift, then blaming the furnace, when the real fault is a blinded filter that starves the fan. Fourth, buying without the waste heat recovery option on a long season plant, which leaves 5 to 8 percent of the fuel bill on the stack every year. Fifth, locating the furnace house where the filter stage draws dusty or tainted air, because no exchanger cleans the air, it only heats it, and the cleanliness of the output air is decided at the inlet.
A heat supply that every kilogram of leaf depends on deserves a supplier with more than a catalogue. Henan Hengxin Boiler Co., Ltd. manufactures under a special equipment production licence and holds ISO9001 and ISO14001 certification with 3A enterprise credit standing, and the certificates page lists the documents for review. The company builds oil and gas fired hot air furnaces alongside its boiler ranges, supports drawings from the customer for custom development, and offers OEM supply for partners who assemble complete processing lines. Where a plant prefers a solid fuel site, the companion biomass (coal) hot blast stove range serves the same indirect hot air duty on agricultural fuel, and the YGL biomass thermal fluid heater covers the high temperature coils elsewhere on the site.
Yes. The furnace delivers one stream of hot air at its outlet, and each user takes its share through a blending damper that mixes furnace air with recirculated air down to the temperature that user needs. A 120 degree drying zone and a 45 degree make up air coil are two settings of the same damper logic, and the burner follows the aggregate demand with slow modulation.
The process air never touches combustion products: the plate exchanger wall separates the streams, and the flue gas leaves through its own stack. In practice the output air is the intake air plus heat, filtered at the inlet. Plants that need documentary proof run odour panel tests or gas analysis on the output side after commissioning, and a simple smoke pencil around the exchanger access panels during operation confirms the separation.
The zones coast on their thermal inertia and the dryer fans keep running, so the leaf sees a falling temperature rather than a dead zone. The furnace restarts on its purge and ignition sequence, which takes a few minutes, and the zone dampers close toward recirculation during the gap to hold what heat the ducts carry. A line that cannot tolerate the gap at all keeps a second smaller furnace on the same header, which is a layout the factory supports.
The leaf throughput and moisture schedule across the dryer zones, the zone temperature set points and how many run at once, the make up air and dehumidification duties, the fuel available and its pressure or grade, and the dimensions of the furnace house. With those figures the factory returns a model selection, an air side layout with filter and damper staging, an estimated fuel consumption and a delivery schedule.
A redrying plant that holds its zone curves through the season is a plant whose heat supply was sized from the evaporation balance, filtered at the inlet, and controlled at the zone dampers rather than at the burner. The WRF-Y(Q) series covers that duty from 0.6 to 2.4 MW in its headline band and beyond across the full fifteen model range, on natural gas or light oil, with an indirect plate exchanger between the flame and the leaf. Henan Hengxin Boiler Co., Ltd. supports the sizing with application engineers who have furnished hot air for food, drying and surface treatment plants, and the company welcomes drawings and process data for custom development. Send the zone schedule and the fuel available, and a selection with layout and consumption figures follows for review before any commitment is made.