A grease kettle looks like a simple tank with an agitator, but the heat duty behind it is one of the more demanding in a lubricant plant. Saponification holds a batch of base oil, fatty acid and alkali at 200 to 230 degrees Celsius for hours, complex greases go higher still, and the jacket around the kettle has to run 30 to 50 K above the batch to push heat through the wall at a useful rate. Saturated steam reaches 230 degrees Celsius only at about 2.8 MPa and 260 degrees Celsius at close to 4.7 MPa, so a plant that heats kettles with steam inherits a high pressure boiler house. A thermal fluid loop delivers the same temperature at 0.7 to 1.0 MPa, where the pressure is only what the circulation pump produces. This article maps the heat users of a grease plant, compares the two heat sources honestly, and works a complete sizing example on the YGL biomass (coal) fired therm fluid heater range.
The scope is a plant of 10,000 to 30,000 tonnes of finished grease per year, running two or three shifts with two or three kettles. The figures are realistic planning estimates drawn from process practice in the lubricant industry; a final selection should always be confirmed against the actual kettle volumes, batch recipe and cycle times of the project.
Grease is a structured mixture: 75 to 95 percent base oil, 5 to 15 percent thickener and a small additive package. The thickener is made inside the plant, not bought, and that is where the heat goes. A typical lithium soap batch charges base oil and 12-hydroxystearic acid, heats to 100 to 120 degrees Celsius to melt and disperse, adds lithium hydroxide slurry, then raises the batch to 200 to 215 degrees Celsius to complete saponification and drive off the reaction water. Lithium complex greases add a dibasic acid and cook at 240 to 260 degrees Celsius for a defined hold time. Calcium sulfonate complex greases cook longer again. After the cook the batch is cooled, additives are blended in, and the product is milled, deaerated and filled.
Three features of this sequence shape the heat supply. First, it is batch work with a large sensible heat load: 10 tonnes of oil and soap raised 185 K in three to four hours is a load of several hundred kilowatts, then nothing, then the same again on the next batch. Second, the jacket temperature is not a free choice. A wall only 10 K above the batch transfers heat slowly and stretches the cook, while a wall far above the batch scorches the soap film in contact with it, and scorched soap shows up as dark specks, poor colour and lost yield. The practical band is a jacket 30 to 50 K above the batch, held steady. Third, the cook temperature sits exactly in the range where steam becomes expensive: high pressure, high temperature, condensate losses and a licensed boiler house.
The table below lists the hot users of a plant with three kettles of 12, 12 and 6 cubic metres. Temperatures follow common practice; each recipe shifts them slightly, but the structure of the load is consistent across the industry.
| User | Operating temperature | Load character | Consequence of a shortfall |
|---|---|---|---|
| Base oil storage and preheat | 50 to 70 degrees Celsius | Continuous, weather dependent | Viscous oil, slow charging, long batch time |
| Saponification kettle jacket | 200 to 230 degrees Celsius | Batch peak of 3 to 5 hours | Incomplete reaction, free alkali, soft grease |
| Dehydration stage | 105 to 120 degrees Celsius | Batch, first 60 to 90 minutes | Water retained, foaming during cook |
| Complex grease finishing | 240 to 260 degrees Celsius | Batch hold at top temperature | Low dropping point, unstable structure |
| Additive premelt and blend | 70 to 90 degrees Celsius | Intermittent | Unmelted additive, poor dispersion |
| Drum and line tracing | 50 to 60 degrees Celsius | Continuous in winter | Stiff product, blocked filling lines |
| CIP and wash water | 60 to 80 degrees Celsius | End of shift | Residue carry over between grades |
| Building heat | 60 to 70 degrees Celsius circuit | Winter load | Comfort and condensation only |
Two observations follow from the table. The kettle jacket dominates, and it dominates in bursts rather than continuously, so a heat source that responds quickly to a step load is worth more than one with a large stored water volume. And every user on the list wants a temperature, not a pressure: none of them needs steam as a medium, which is why a single thermal fluid loop can serve the whole plant with one set of headers.
Many older grease plants were built around a steam boiler, and the honest answer is that steam is perfectly good up to about 150 degrees Celsius. Above that it becomes a different proposition. The comparison below reflects what the two systems actually do on a saponification duty.
| Aspect | Saturated steam plant | YGL thermal fluid loop |
|---|---|---|
| Pressure to hold 230 degrees Celsius | About 2.8 MPa at the jacket | 0.7 to 1.0 MPa, pump pressure only |
| Pressure to hold 260 degrees Celsius | About 4.7 MPa | Same 0.7 to 1.0 MPa loop |
| Regulatory character | High pressure steam boiler with licensed operation and periodic inspection | Low pressure closed loop, monitored by flow, level and temperature |
| Jacket wall temperature | Condensing steam gives a hot inlet zone and a cooler outlet zone | Bulk flow holds the wall within 20 to 40 K of supply temperature |
| Energy path | Condensate, flash steam and trap losses of roughly 5 to 15 percent | Closed circuit, no condensate loss |
| Response to a batch step load | Steam flow control is coarse at low load | Modulating burner with a small oil inventory responds within minutes |
| Cold start | Fast, but thermal shock on a cold jacket | Controlled warm up ramp, slower but gentler |
| Routine maintenance | Traps, condensate lines, water treatment, boiler inspection | Pump seals, oil analysis, burner service, coil cleaning |
The practical conclusion for most new plants is a single thermal fluid loop for the kettles, the high temperature users and the tracing, with steam kept only where it already exists and performs well. Where a plant needs both, the thermal fluid loop is usually the smaller and simpler of the two systems to own.
Grease plants are often located in industrial zones where wood pellets, wood chips, palm kernel shells or rice husk are locally available, and the heat demand is steady enough through the year to justify a solid fuel appliance. The table below converts delivered heat into fuel, using the published efficiency of the YGL range and typical lower heating values. Prices are indicative and should be replaced with local contract figures.
| Fuel | Lower heating value | Fuel per MWh of delivered heat | Indicative price | Indicative fuel cost per MWh |
|---|---|---|---|---|
| Wood pellets | 16.5 MJ/kg | 263 kg | 130 USD per tonne | 34 USD |
| Wood chips | 11.0 MJ/kg | 394 kg | 60 USD per tonne | 24 USD |
| Rice husk | 13.0 MJ/kg | 333 kg | 35 USD per tonne | 12 USD |
| Palm kernel shells | 17.0 MJ/kg | 255 kg | 110 USD per tonne | 28 USD |
| Coal | 22.0 MJ/kg | 197 kg | 120 USD per tonne | 24 USD |
| Natural gas, for reference on a YY(Q)W unit | 35.6 MJ/Nm3 | 112 Nm3 at 90 percent | 0.35 USD per Nm3 | 39 USD |
Fuel choice is rarely decided on price alone. Pellets are the easiest fuel to handle in a plant with limited space and a clean yard, and they burn with low ash and stable output. Chips and husk are cheaper per MWh but need more storage volume, more careful moisture control and more ash handling. Where the site has no room for a fuel store or the local air permit excludes solid fuel, a gas fired YY(Q)W thermal fluid heater is the natural alternative on the same loop design.
The YGL is a vertical, forced circulation thermal fluid heater with a three pass coil, burning biomass pellets, chips, husk or coal. The model number is not the output: the rated heat power is listed in units of 10 thousand kilocalories per hour, so a YGL-120SCIII delivers 10 and a YGL-1400SCIII delivers 120, which is 0.12 to 1.40 MW. The table below reproduces the published parameters.
| Model | Rated heat power (10^4 kcal/h) | Approximate MW | Working pressure (MPa) | Max temperature (C) | Efficiency | Circulation (m3/h) | Heating area (m2) | Oil volume (m3) | Transport weight (kg) | Transport size L x W (mm) |
|---|---|---|---|---|---|---|---|---|---|---|
| YGL-120SCIII | 10 | 0.12 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 12.5 | 7.3 | 0.06 | 3,000 | 840 x 1,608 |
| YGL-240SCIII | 20 | 0.23 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 20 | 16.3 | 0.19 | 3,300 | 1,250 x 2,080 |
| YGL-350SCIII | 30 | 0.35 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 30 | 22.4 | 0.26 | 3,600 | 1,350 x 2,050 |
| YGL-500SCIII | 40 | 0.47 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 40 | 30.8 | 0.37 | 4,000 | 1,450 x 2,300 |
| YGL-700SCIII | 60 | 0.70 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 60 | 44.0 | 0.50 | 4,500 | 1,750 x 2,680 |
| YGL-1000SCIII | 80 | 0.93 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 80 | 63.2 | 0.70 | 5,100 | 1,750 x 2,990 |
| YGL-1200SCIII | 100 | 1.16 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 100 | 71.0 | 0.80 | 5,400 | 2,550 x 3,030 |
| YGL-1400SCIII | 120 | 1.40 | 0.7 / 1.0 | 290 / 320 | at least 83 percent | 140 | 87.6 | 1.05 | 6,000 | 2,250 x 3,140 |
Inside the heater the oil is pumped through a coil that wraps the combustion chamber, and the flow is forced rather than natural. That matters at the kettle end: the loop delivers a fixed flow at a controlled supply temperature, so the jacket sees a steady stream of hot oil rather than a condensing vapour that cools along the path. Because the film temperature inside the coil stays close to the bulk temperature, the oil degrades slowly and the wall of the kettle stays in the band that cooks soap without scorching it.
Every model carries a rated circulation rate from 12.5 to 140 cubic metres per hour, and that figure is not decorative. A jacket with narrow passages, long headers or several kettles in parallel can absorb a large part of the pump head, and if the resulting flow falls below the rated figure the coil runs hotter than the bulk oil for the same output. Check the jacket and pipework pressure drop before fixing the model, not after the first batch.
The plant in this example runs three kettles of 12, 12 and 6 cubic metres, two shifts in summer and three in winter, with one high temperature complex grease campaign each week. All figures are planning values.
A 12 cubic metre charge is about 10,800 kg at a typical density of 0.9. With a specific heat near 2.1 kJ/kg K and a rise from 30 to 215 degrees Celsius, the batch needs 10,800 x 2.1 x 185 = 4.20 million kJ. Spread over a 3.5 hour heat up that is 333 kW, and adding 8 percent for jacket and radiation losses gives 360 kW per kettle. The 6 cubic metre kettle works out at 180 kW on the same basis.
Production scheduling allows two kettles to be in heat up at the same time, so the heat up contribution is 720 kW. To that add the high temperature hold on one kettle at 90 kW, base oil storage and tracing 70 kW, filling and drum warming 30 kW, CIP 25 kW and building heat 40 kW. The dehydration stage runs inside the same kettles and does not add to the total. Connected load is therefore 975 kW.
Not every user peaks together, so a diversity factor of 0.85 is reasonable for a plant of this size, giving 829 kW. A design margin of 10 percent covers fouled jackets, colder raw material in winter and a slightly longer cook than the recipe states, which brings the design load to 912 kW. That is the number the heater must hold, not the connected total.
Converting the range into kilowatts, one unit of 10^4 kcal/h equals 11.63 kW, so the YGL-700SCIII is 698 kW, the YGL-1000SCIII is 930 kW and the YGL-1200SCIII is 1,163 kW. Against a 912 kW design load the YGL-1000 sits at 98 percent, which leaves no room for a cold winter morning or a fouled coil, so it is rejected. The three workable arrangements are compared below.
| Scheme | Model | Rated output | Load against 912 kW design | Standby | Comment |
|---|---|---|---|---|---|
| A | 1 x YGL-1200SCIII | 100 x 10^4 kcal/h, about 1,163 kW | 78 percent | None | Lowest capital cost, single point of failure |
| B | 2 x YGL-700SCIII | 60 x 10^4 kcal/h each, about 698 kW | 65 percent each, 77 percent with one unit out | Full unit | Recommended for three shift plants |
| C | 1 x YGL-1200SCIII plus 1 x YGL-350SCIII | 1,163 kW plus 349 kW | 78 percent plus reserve | Partial | Staged build for a planned third kettle |
Scheme B is the usual recommendation where grease is made around the clock and a stopped kettle costs a whole batch plus the changeover time. Two smaller units also fit a low boiler house more easily, since each transport dimension is 1,750 x 2,680 mm against 2,550 x 3,030 mm for the single large unit. Scheme A is defensible for a single shift plant with a cold standby electric heater on one kettle.
At 4,200 equivalent full load hours and an average load of 0.91 MW the plant delivers about 3,820 MWh of heat a year. At 263 kg per MWh that is roughly 1,005 tonnes of wood pellets, or about 1,510 tonnes of wood chips, or 1,270 tonnes of rice husk. Those numbers size the fuel store: at 1,000 tonnes a year and a two week buffer, a covered store of about 60 square metres with a 4 metre stacking height is adequate for pellets.
A loop serving a 230 degree Celsius cook typically runs 270 to 280 degrees Celsius supply and 250 to 260 degrees Celsius return, a difference of 20 to 30 K. At a 912 kW design load that asks for roughly 65 to 75 cubic metres per hour of oil, comfortably inside the rated circulation of both recommended models. Keeping the return temperature high protects the oil and keeps the whole loop above the point where viscosity rises sharply.
The loop volume of a three kettle plant with headers and jackets is typically 6 to 9 cubic metres, against an oil inventory of 0.5 to 0.8 cubic metres inside the heater itself. The expansion tank must take the full thermal expansion of that volume between cold fill and 280 degrees Celsius, plus a working margin, and it must be the highest point of the circuit with a vent so that water and light ends leave during the first warm up. A low level cut out on the tank is a mandatory interlock, not an option.
Most grease kettles are jacketed, and the jacket is usually divided into two or three zones so that the lower zone, where the soap settles, can be held slightly hotter than the upper zone. A three way valve per zone with a common return header gives control within about 2 K, which is enough to follow a cook curve. Internal coils transfer heat faster but are harder to clean and can trap product; for grease they are normally used only on small pilot kettles.
A biomass heater is only as reliable as its fuel supply. Pellets should be stored dry, under cover, and used within a season; moisture above 12 percent costs efficiency and produces smoke at start up. Chips need more volume and more attention to size consistency, because long splinters bridge in the hopper and starve the feed screw. Rice husk is abrasive and has a high ash content, so the ash removal system and the grate need to be specified for it from the start rather than adapted afterwards.
On the flue gas side, a cyclone followed by a bag filter is the usual arrangement for a plant inside an industrial zone, and the stack height follows local rules rather than a catalogue figure. Fly ash and bottom ash from pellets are modest, a few tonnes a year at this scale, but they still need a covered bin and a documented removal route, because ash dust is a nuisance in a clean lubricant plant. Where a solid fuel permit is not available, the gas alternative on the same loop removes the fuel store, the ash and the stack dust entirely.
| Mistake | What happens | Better approach |
|---|---|---|
| Sizing on the average load instead of the simultaneous heat up | Batches stretch, the burner runs flat out for hours | Build the connected load from the batch schedule, then apply diversity |
| Reusing a steam jacket on a thermal fluid loop | High pressure drop, low flow, overheated film in the coil | Check jacket and header pressure drop before choosing the model |
| No allowance for expansion volume | Oil spills from the tank on the first heat up | Size the tank on the whole loop volume, cold to full temperature |
| Fuel store sized for a few days | Production stops when a delivery is late | Two weeks of buffer at the design consumption |
| Wet or oversized biomass | Unstable combustion, clinker, smoke at start up | Moisture below 12 percent, fuel specification in the contract |
| No margin for high temperature greases | Complex grease campaigns run at reduced rate | Size on the hottest recipe, not the everyday product |
| Interval | Task |
|---|---|
| Daily | Log supply and return temperature, expansion tank level, coil differential pressure, fuel feed and ash level |
| Weekly | Check pump seals and noise, clean the flame sensor and fan, test the safety cut outs, inspect the fuel hopper for bridging |
| Monthly | Inspect insulation and pipe supports, verify control valve travel on each jacket zone, clean the filter on the flue train |
| Quarterly | Sample the thermal oil for viscosity, total acid number and flash point, and trend the results against the baseline |
| Annually | Full burner service, coil and flue gas side inspection, jacket gasket check, recalibration of temperature and pressure instruments |
Thermal oil life depends far more on film temperature and flow than on the calendar. A plant that keeps flow above the minimum, reacts to the quarterly oil analysis and holds the supply temperature inside the design band will normally run many years on one charge; a plant that runs low flow at the top of the temperature range will replace fluid much sooner and should budget for it from the start.
A thermal fluid heater sits at the heart of a process where a failed batch is expensive, so the supplier should be able to show more than a price. Henan Hengxin Boiler Co., Ltd. manufactures under a special equipment production licence and holds ISO9001 and ISO14001 certification with 3A enterprise credit standing, and the certificates page lists the documents for review. The company has built boilers for the chemical industry for decades, including thermal fluid systems for process heating, and it also develops custom configurations: special fuels, unusual capacity points, skid mounted assemblies with circulation pump and expansion tank pre piped, and control integration with a plant SCADA system. Drawings from the customer are welcome, and OEM supply is available for partners who build complete grease lines.
Yes. The range is designed for maximum working temperatures of 290 or 320 degrees Celsius depending on the oil, so a 230 degree cook sits well inside the band with margin for the film temperature inside the coil. Stable batch temperature depends on steady loop flow and a modulating burner, both of which are part of the standard control package.
No. Heat reaches the batch through the jacket wall or an internal coil, and the loop is a closed circuit. Nothing is injected into the kettle, so there is no route for oil to enter the product, and the separation is documented for quality audits.
Yes, with the fuel feed, grate and ash system specified for that fuel. Chips need more storage and closer moisture control, and husk produces much more ash, so the ash handling has to be sized for it. For a plant with limited space and a clean yard, pellets remain the simplest choice.
Kettle volumes and number, batch temperatures and cycle times, how many kettles can heat at once, the hottest recipe, the fuel available and its analysis, and the boiler house dimensions. With those figures the factory returns a model selection, a loop layout, an estimated fuel consumption and a delivery schedule.
The difference between a plant that cooks to schedule and one that fights its heat supply almost always lies in the heat balance, not in the hardware. Measure what the kettles really do, apply the four steps above, and let the numbers choose the model. Henan Hengxin Boiler Co., Ltd. supports that process with application engineers who have sized thermal fluid systems for food, chemical, wood and surface treatment plants, and the company welcomes drawings and process data for custom development. Send the kettle volumes, the cook temperatures and the fuel available, and a sizing proposal with layout and consumption figures follows for review before any commitment is made.