SZS Oil Gas Fired Boiler for Industrial Park Steam

November 17,2026    hxboiler    

When a dozen factories share one boundary wall, the cheapest kilogram of steam is the one produced in a properly designed central plant. Each tenant alone would buy a small fire tube boiler, hire an operator, hold a fuel contract and accept a maintenance burden that never disappears; together they can run three large water tube boilers around the clock, meter every tonne, and pay one fuel bill instead of ten. The engineering problem is real, though: the plant has to absorb dyeing houses that pull steam in waves, a corrugator that never stops, a pharmaceutical block that demands absolute pressure stability, and a winter heating coil that appears for three months and vanishes. This article works through that problem for a mid sized park and shows how an SZS oil/gas fired boiler range covers it from end to end.

The worked example uses a park of fourteen tenants with a connected steam demand of 62 tonnes per hour: two textile dyeing mills, a food processing cluster, a pharmaceutical plant, two packaging and paper converting lines, a rubber moulding shop, a laundry, an electroplating shop, a plywood mill and the common services. The method, however, is the same for any park, and the numbers can be rebuilt with the tenant list of any site the reader is planning.

Where the Steam Goes in an Industrial Park

The first document a park steam plant needs is not a boiler specification but an honest tenant load list. In practice the list is assembled from the equipment each tenant intends to install, and it is the forgotten consumers, the laboratory autoclave, the winter heating coil, the tanker heating jacket, that later break the balance.

Tenant categoryTypical steam conditionsLoad characterWhat a shortfall costs
Textile dyeing and finishing0.6 to 0.8 MPa to dyeing machines, dryers and washing rangesBatch waves, two to eight tonnes per hour per millDye lots rejected when temperature dips mid cycle
Food processing cluster0.5 to 0.8 MPa to blanchers, cookers, sterilisers and CIPShift peaks, hygiene driven cleaning blocksProduction stops, cleaning cannot start, shift lost
Pharmaceutical plant0.8 MPa plant steam feeding clean steam generators, 0.2 MPa sterilisationStrict stability, autoclave batchesBatch documentation fails, whole batch discarded
Paper converting and packaging0.8 to 1.2 MPa to corrugator preheaters and glue kitchenContinuous, the highest single connected loadCorrugator speed drops, delamination and waste
Rubber and tyre moulding0.8 to 1.0 MPa to vulcanising presses and bladdersBatch, cure cycles of one to three hoursCure interrupted, scrap and press downtime
Laundry and uniform service0.6 to 0.8 MPa to washers, extractors and ironersDay shift, Monday and Friday peaksContracts missed, ironer wrinkles rejected
Electroplating and surface treatment0.2 to 0.4 MPa to tank heating and degreasingSteady, small, sensitive to chemistryBath temperature drift, plating defects
Plywood and wood processing0.6 to 0.9 MPa to hot presses and log conditioningCycle batches with sharp opening of the pressPress cycle extended, output per shift falls
Park services0.4 to 0.6 MPa to heating coils, hot water and tanker heatingSeasonal and intermittentCold offices, frozen lines in winter nights

Two things stand out. First, the pressures wanted by the tenants span from 0.2 to 1.2 MPa, which means the plant must produce at one pressure and distribute at several, a subject taken up below. Second, the textile and food waves rarely arrive together, and that is exactly where the economics of a shared plant come from.

Diversity Factor and the Load Duration Curve

Adding the connected loads of fourteen tenants gives 62 tonnes per hour. Buying boilers for 62 tonnes would be absurd, because no tenant reaches its maximum at the same moment as every other tenant. The ratio between what is actually drawn and what is connected is the diversity factor, and it is the single most important number in the whole project.

Load groupBehaviourShare of annual steamDesign consequence
Continuous process baseCorrugator, plating tanks, hot water, running whenever the park runs55 to 65 percentCarried by one or two boilers at steady output
Batch process peaksDyeing waves, cure cycles, autoclaves, 30 to 180 minutes long25 to 35 percentDrives installed capacity and pressure stability
Seasonal heatingOffice and workshop heating coils, three to five months5 to 10 percentDecides whether a fourth boiler is justified
Night and weekendPark runs at 15 to 25 percent of the day loadSmallDecides how many boilers can stay in low fire

The way to check the diversity assumption is a load duration curve: plot the estimated hourly demand for a full year from highest to lowest. If the curve shows 62 tonnes only for a few winter hours when heating overlaps a dyeing wave, the plant buys boilers for something like 49 tonnes and accepts a rare curtailment rule; if the curve is flat and high, the connected sum is closer to the truth and the boiler count grows. Parks that skip this exercise usually discover the error in the first winter, either as a header that cannot hold pressure at four in the afternoon or as three boilers idling at 30 percent through the summer.

Why a Water Tube Boiler Carries a Park

At twenty tonnes per hour and above, the engineering argument shifts from fire tube to water tube construction, and the SZS range is the platform this article is built on.

Membrane wall furnace and D-type layout

The SZS is a double drum horizontal water tube boiler with a D-type layout: convection tube bundle on one side, radiant furnace on the other, both surrounded by membrane water walls. The membrane wall replaces refractory brick, so the furnace reaches operating temperature in minutes rather than hours and the outer casing stays cool, which cuts the insulation weight and the heat loss into the boiler house. The large radiant furnace keeps the heat release rate moderate, which is what makes a stable, low emission flame possible at large capacities.

Fast response with a small water volume

A water tube boiler holds far less water than a fire tube shell of the same output. The stored energy is smaller, but the circulation is faster and the burner sees the load change immediately, so the header recovers from a dyeing wave in tens of seconds. For park duty, where waves arrive from several tenants at unpredictable intervals, this response matters more than the shell thermal ballast that helps a single factory boiler ride through short spikes.

Quick assembly up to 75 tonnes, bulk supply beyond

Up to SZS75 the boiler ships as a quick assembled package, which keeps the site schedule measured in weeks; the SZS100, SZS110 and SZS150 ship in bulk and are assembled on site by the supplier crew. A park of the size in the worked example never needs the bulk route, but it is worth knowing the ceiling exists before a master plan promises a tenant cluster an unbounded steam supply.

SZS Compared With the Fire Tube Alternative

Many park proposals start from a row of large fire tube boilers because the type is familiar. The comparison below sets out where the two constructions actually differ, and where each one stops being the right answer.

AspectSZS water tubeFire tube shell
Capacity band6 to 150 tonnes per hourCommonly 1 to 20 tonnes per hour
StructureDouble drum, D-type, membrane water wallsCorrugated furnace inside a large shell, wet back
Transport weight32,000 to 80,500 kg assembled packages5,500 to 30,000 kg typical
Response to load wavesFast, small water volume, immediate burner actionSlower, large shell damps short spikes
Pressure rating1.25, 1.6 or 2.5 MPaTypically up to 2.5 MPa, smaller surface
Best fitPark steam plants above roughly 20 tonnes per hourSingle factories up to about 20 tonnes per hour

A park with a design load below 20 tonnes per hour may well be served by two or three fire tube boilers at lower capital cost, and honesty requires saying so. Above that line the water tube construction wins on efficiency at sustained load, on furnace volume for clean combustion and on the simple fact that eight fire tube shells would be needed where three SZS20 packages stand.

Header Pressure and Pressure Reducing Stations

The plant produces at the highest pressure any tenant needs plus margin, and every lower pressure level is created at a pressure reducing station, not inside the tenants. Each station carries a strainer, a reducing valve with a standby path, a separator and a trap set, so the tenants receive dry steam at a stable pressure whatever the boiler is doing.

LevelSupplied usersNotes
1.25 MPa main headerCorrugators and the highest duty dryersProduced directly by the SZS boilers
0.8 MPa stationVulcanising presses, food cookers, heavy dryer coilsMost of the connected load sits here
0.6 MPa stationDyeing machines, hot presses, log conditioningWave load, station sized for the simultaneous wave
0.4 MPa stationLaundry, plating tanks, heating coils, hot waterAlso feeds the make up water heater
0.2 MPa stationSterilisation and any direct steam injectionSeparate separator and trap, dry steam only

Running the whole park on one pressure is a common false economy. Tenants at 0.2 MPa supplied from an uncontrolled 1.25 MPa header burn their control valves, water hammer travels down the line, and the pharmaceutical tenant discovers that its sterilisation cycle drifts whenever the corrugator opens its preheaters.

The SZS Range and What Each Model Covers

Twelve ratings span 6 to 150 tonnes per hour at 1.25 MPa, with 1.6 and 2.5 MPa available for parks that want margin on the header or feed a turbine. Saturated steam at full pressure leaves the boiler at 194 to 225 degrees Celsius, the design fuels are natural gas, light oil and heavy oil, and published efficiency is 93.3 to 97 percent thanks to the finned tube economiser and condenser at the boiler tail. The table reproduces the transport data a project team needs for foundations and cranage.

ModelCapacity (t/h)Max transport weight (kg)Transport size L x W x H (mm)
SZS6-1.25-YQ632,0007,800 x 2,400 x 2,400
SZS8-1.25-YQ832,0007,800 x 2,400 x 2,400
SZS10-1.25-YQ1032,0007,800 x 2,400 x 2,400
SZS20-1.25-YQ2040,0008,000 x 3,600 x 4,500
SZS30-1.25-YQ3040,0008,000 x 3,600 x 4,500
SZS40-1.25-YQ4040,0008,000 x 3,600 x 4,500
SZS50-1.25-YQ5051,0008,900 x 3,900 x 4,000
SZS65-1.25-YQ6568,20010,500 x 4,300 x 4,320
SZS75-1.25-YQ7580,50012,330 x 4,400 x 4,530
SZS100 / 110 / 150-1.25-YQ100 / 110 / 150Bulk supply, site assemblyAssembled on site

The burner is an imported Baltur unit with full automatic control: pre purge, ignition, power modulation, shutdown and flameout protection run without operator intervention, and the programmable control adds water level control, overpressure protection, gas leakage detection and the interlocks that a park operator with several boilers on one header cannot do without.

Sizing a Park Steam Plant in Four Steps

Step 1: sum the connected loads honestly

The fourteen tenants of the worked example add up to 62 tonnes per hour connected: the corrugator line at 12, the two dyeing mills at 9 and 7, food at 8, pharmaceutical at 6, rubber presses at 7, plywood at 6, laundry at 3, plating at 2, and park services and contingencies at 2. The number is real, and it is also not the design load.

Step 2: apply the diversity factor

From the tenant schedules and a winter heating overlap, a diversity factor of 0.72 is justified, which brings the coincident demand to about 44.6 tonnes per hour. The diversity assumption should be signed off by the park operator, because it fixes the capital cost, and a conservative 0.80 adds two boiler sizes that may never earn their keep.

Step 3: add the engineering margin

Ten percent covers fouled coils, cold make up water in winter, calibration drift in the meters and the first phase of park expansion. The design load is therefore 44.6 multiplied by 1.10, which is 49.1 tonnes per hour.

Step 4: choose models and check redundancy

The comparison below holds the same 49.1 tonne design load against four plausible configurations.

ItemBasisResult
Connected load, fourteen tenantsTenant equipment list62 t/h
Coincident demand62 x 0.72 diversity44.6 t/h
Design load with margin44.6 x 1.1049.1 t/h
SchemeInstalled capacityLoad at design pointIf one unit stopsVerdict
A: one SZS50-1.25-YQ50 t/h98 percentNo steam at allRejected, no margin and no standby
B: two SZS30-1.25-YQ60 t/h82 percent30 t/h, heavy curtailmentWorkable, winter is tight
C: three SZS20-1.25-YQ60 t/h82 percent40 t/h, 81 percent of designSelected, genuine N plus one
D: SZS40 plus SZS2060 t/h82 percent20 t/h onlyRejected, one outage stops half the park

Scheme C is the configuration most park operators settle on. Three identical SZS20 packages share the header through isolating valves, any two of them carry the design load, and the third rotates into maintenance without a shutdown notice to fourteen tenants. Overnight, a single unit at low fire covers the 15 to 25 percent night demand, which keeps the burner in a clean part of its modulation range instead of cycling.

Steam Metering, Condensate Policy and Water Chemistry

A park lives or dies on its ability to bill steam fairly and to keep the boiler water under control, and both are design tasks, not administrative ones.

Meter every tenant, compensate every meter

Each branch leaves the metering room through a flow computer that reads the vortex or differential pressure meter together with pressure and temperature, because one kilogram of steam at 0.8 MPa occupies a very different volume than at 0.2 MPa and an uncompensated meter bills accordingly. The metering room sits between the boiler house and the tenant blocks, with isolation valves so that a meter can be serviced without stopping the branch, and the monthly statement should show mass, pressure, temperature and the tariff, so disputes end in the data instead of in a negotiation.

Condensate return is audited, not assumed

In a single factory, 80 percent condensate return is normal. In a park it is earned, tenant by tenant: the corrugator and the laundry return clean hot condensate willingly, a dyeing house may return condensate coloured with dye residues, a plating shop may return condensate with metal traces, and any line that fails the acceptance test drains to the effluent plant until it is corrected. The acceptance rule is simple: pH between 8.5 and 9.5, hardness zero, iron below 0.3 mg/L, no oil sheen, conductivity within the agreed band. Every accepted tonne returns at 80 to 95 degrees Celsius and saves fuel, water and treatment chemicals in equal measure.

ParameterTargetReason
Make up water hardness0.03 mmol/L or lowerScale on membrane walls and drums is the main failure driver
Boiler water pH at 25 degrees Celsius10 to 12Protects the pressure parts inside the accepted treatment programme
Total dissolved solids3,000 to 3,500 mg/LKeeps carryover low so tenant meters and control valves stay dry
Dissolved oxygen after deaerator0.05 mg/L or lowerPrevents pitting in drums, tubes and economiser
Returned condensate pH8.5 to 9.5Acid condensate marks corroded tenant lines before they cost a shutdown
Returned condensate oil and ironNegligible, tested per acceptance listContaminated return goes to effluent, never to the deaerator

Fuel Consumption and Emissions

At an average output of 28 tonnes per hour over 6,500 operating hours, the plant delivers about 182,000 tonnes of steam a year. The consumption figures below assume 50 to 70 percent of condensate returned at 80 degrees or hotter, which is the realistic band for a park with a firm condensate acceptance policy.

FuelPer tonne of steamAnnual at 182,000 tNote
Natural gas75 to 80 Nm313.7 to 14.6 million Nm3Pipeline supply, cleanest flue gas, lowest maintenance
LPG59 to 62 kg10,700 to 11,300 tSites without a pipeline, stored in spheres
Light diesel61 to 64 kg11,100 to 11,650 tBackup fuel, dual fuel burners switch automatically
Heavy oil63 to 66 kg11,500 to 12,000 tNeeds heating and treatment, chosen on price

Keeping the flue gas inside the permit

A park boiler house operates for decades, and the emission permit is renewed in an environment that only tightens. The Baltur burners are configured with flue gas recirculation where the local limit demands it, and a park of this size is normally able to hold nitrogen oxide in the low tens of milligrams per cubic metre with gas firing, which is comfortably inside the strictest regional limits. Continuous monitoring of oxygen, carbon monoxide and nitrogen oxide on each stack is part of the control package, and the flue gas leaving through the economiser and condenser at 60 to 80 degrees Celsius carries the recovered sensible and latent heat that puts the 93.3 to 97 percent efficiency on the fuel bill.

Safety around a large gas train

Three SZS20 packages burn roughly 6,000 Nm3 of gas per hour at full load, so the gas train, the double block and bleed valves, the leakage detection and the venting of the relief valves are engineered as one system, inspected against the special equipment rules that apply in the jurisdiction. The explosion relief doors at the boiler tail, the flameout protection and the purge sequences are all standard on the SZS control programme, but they only protect the plant if the operating team keeps them tested, which is a maintenance calendar question.

Installation and Commissioning Checklist

ItemWhy it matters
Foundations for three packages of 40,000 kg each, crane access plannedEach SZS20 ships at 8,000 x 3,600 x 4,500 mm, the lift needs a clear route and certified gear
Gas pressure regulating and metering skid sized for 6,000 Nm3 per hourUndersized PRS drops the burner below its pressure window at peak
Main header with expansion loops and graded slope to drainsA park header is long, and trapped condensate becomes water hammer
Five pressure reducing stations built as specified, each with separator and trapsTenant pressure stability is created here, not at the boiler
Tenant branch metering room with compensated flow computersBilling disputes end in data only if the meters were right from day one
Condensate lines with per tenant check valves and acceptance sampling pointsOne contaminated tenant line must be isolable without debate
Water treatment skid, softener train, deaerator and dosingThree boilers share one water circuit, chemistry errors multiply
Blowdown tank and sampling cooler per boilerBlowdown is hot and legal limits apply to the drain
Control integration of three boilers on one headerLead lag logic, rotation and standby is commissioned, not bought
Steam purge and burner tuning at first fireLow emission numbers are set at commissioning and checked every year

Maintenance Calendar for a Park Boiler House

IntervalTasks
DailyWater level checks, bottom and surface blowdown, log header pressure and stack readings, walk the header and listen for water hammer
WeeklyGauge glass tests, safety valve lever check, water chemistry full panel, meter room walkthrough, strainer differential check
MonthlyBurner inspection, flue gas analysis and trim, PRS valve exercise, trap survey with an ultrasonic tester, condensate sampling per tenant
QuarterlyFlow computer calibration check, low NOx recirculation verification, feed pump and deaerator service, membrane wall visual inspection
AnnualStatutory inspection of pressure parts, safety valve certification, refractory and casing check, economiser and condenser cleaning, control interlock functional test

Five Mistakes That Cost Parks Money

MistakeWhat it causesThe fix
Sizing on the connected sum instead of the diversity factorTwo boilers too many, running all summer at 30 percentBuild the load duration curve and sign off the diversity assumption
One large boiler instead of two or three smaller onesAny outage or inspection stops fourteen tenants at onceN plus one with identical packages on one header
Uncompensated tenant metersBilling disputes, tenants pay for pressure they never usedPressure and temperature compensated flow computers per branch
Condensate returned without an acceptance testContaminated return foams the boiler water and poisons the chemistryPer tenant acceptance list, isolable lines, sampling points
Winter heating added at the last minute to the day loadHeader collapse on the first cold afternoonInclude the heating coil in the load duration curve from the start

Supplier, Custom Drawings and OEM

Henan Hengxin Boiler Co., Ltd. manufactures the SZS range at its works in Taikang County, Zhoukou, Henan, and holds ISO 9001 and ISO 14001 certification, a special equipment manufacturing licence and a 3A credit rating, with the certificates listed on the honor page. For a park steam plant the engineering team starts from the tenant load list rather than a catalogue: the diversity assumption, the pressure levels, the fuel analysis, the altitude and the master plan for park expansion all shape the proposal, and the central heating application page shows comparable district scale installations. Custom drawings, non standard pressure ratings, dual fuel burners, containerised metering rooms and OEM supply under the customer brand are all routine, and the SZS natural gas, light oil and heavy oil fired boiler detail page carries the full parameter set for the technical committee.

Project documentation normally includes the general arrangement, foundation loading, gas train schematic, header isometrics, electrical interface list, commissioning procedure and the operating manual, issued in English or in the language of the end user. Spare parts recommendations for the first two years are quoted with the boiler, so the life cycle cost the park finance team sees is the real one.

FAQ

What boiler capacity does a park with fourteen tenants and 62 tonnes per hour connected need?

With a signed off diversity factor of 0.72 and a ten percent margin, the design load is about 49 tonnes per hour, which is met by three SZS20-1.25-YQ packages. Any two carry the full design load at 82 percent, the third rotates through maintenance, and a single unit covers the night load in low fire. A park with different tenant mix should rebuild the load duration curve before copying the answer.

Why water tube instead of a row of large fire tube boilers?

Above roughly 20 tonnes per hour the SZS water tube construction wins on sustained efficiency, on furnace volume for clean low emission combustion and on plant simplicity, because three packages replace eight shells with eight burners and eight maintenance schedules. Below that line two fire tube boilers are often the cheaper honest answer.

How is steam billed fairly between tenants?

Every branch passes a flow computer that reads mass flow together with pressure and temperature and integrates the compensated result. The monthly statement shows mass, pressure, temperature and tariff per tenant, so the corrugator with its 12 tonnes per hour pays for what it draws and the plating shop is not subsidised into a complaint.

Can all tenant condensate be returned to the boilers?

Only the tenants that pass the acceptance test, and the test is repeated, not assumed. Clean condensate from the corrugator and laundry returns at 80 to 95 degrees Celsius and pays for itself twice, while a dyeing or plating line that fails the pH, iron or oil test drains to the effluent plant until its lines are corrected. Every accepted percentage point of return lowers the fuel bill, which is why the acceptance policy belongs in the tenant contracts from the first draft.

A park steam plant is the one place where boiler engineering and utility accounting meet in the same room, and the SZS range was built for exactly that meeting: enough capacity to hold a header steady against fourteen unpredictable tenants, efficiency that survives the fuel audit, and a control package that runs three boilers as one system. Send the tenant load list, the pressure levels and the fuel situation to the Hengxin application team, and the reply will include the load duration check, a boiler count, a layout drawing and the fuel figures at the local gas price.

RECOMMENDED PRODUCTS

  • 1Rated Steam Capacity(t/h)4-20
  • 2Rated Working Pressure(MPa)1.25/2.5
  • 3Saturated Steam Temperature(℃))194-225
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Steam Capacity(t/h)1-20
  • 2Rated Working Pressure(MPa)0.7-2.5
  • 3Saturated Steam Temperature(℃))171-225
  • 4Design FuelNatural Gas,Light Oil,Heavy Oil etc.
  • 1Rated Steam Capacity(t/h)0.5-10
  • 2Rated Working Pressure(MPa)1.25
  • 3Saturated Steam Temperature(℃))194
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Output(t/h)0.5-4.0
  • 2Rated Steam Pressure(MPa)1.0-1.6
  • 3Steam Temperature(℃))184-204
  • 4Apply FuelDiesel oil、Heavyoil、 Natural gas
  • 1Rated Steam Capacity(t/h)1-20
  • 2Rated Working Pressure(MPa)1.0-2.5
  • 3Saturated Steam Temperature(℃))184-225
  • 4Design FuelNatural Gas,Light Oil,Heavy Oil etc.
  • 1Rated Heat Power(MW)10-120
  • 2Rated Working Pressure(MPa)0.7-1.0
  • 3Max Working Temperature(℃))290/320
  • 4Design FuelBiomass Fuel

Inquiry

Contact

Hengxin
Taikang Hengxin Boiler Co., Ltd. is located in Taikang County, Zhoukou City, Henan Province, the company was founded in 2016, is a specialized in boiler,pressure vessel products research and development, design, production, sales, installation, transformation and aseries of services. 7 years of development, Hengxin boiler has established a complete product line.The product line includes 8 kinds of oil and gas boiler, coal boiler, biomass boiler, hot blast stove, heat conductionoilboiler,electric boiler,waste heat boiler, circulating fluidized bed boiler,pressure vessel,28productseries,morethan 300models.Products cover agriculture,forestry,husbandryand fishery, food, textile, manufacturing, chemical, building materials, metallurgy and minerals, power supply and heating and many other industries. Hengxin Boiler,asone of the earliestenter prisesengaged in the boiler industry in China,was the first toobtain the B-classboiler manufacturing license issuedby the General Administration of Qua...