Plants that run a thermal fluid loop rarely replace the loop itself. The pipework, the jackets, the ovens and the press platens stay in service for decades, while the heater at the heart of the loop ages, burns expensive fuel and slowly falls behind tightening emission rules. That is exactly the situation the YGL biomass(coal) fired thermal fluid heater was built for: a vertical, forced circulation biomass heater that takes the place of an ageing coal, oil or gas fired unit, keeps the working pressure at only 0.7 to 1.0 MPa while the medium leaves at 290 to 320 degrees Celsius, and reaches a liquid phase temperature up to 340 degrees Celsius for processes that need the last margin. This guide walks through the whole conversion: which parts of an existing plant can stay, how to size the new heater, what the eight standard models offer, how the fuel bill changes, and what a buyer should check in the supplier before the order is signed.

Why Plants Convert Their Thermal Fluid Heaters to Biomass

Fuel Cost and Local Availability

Thermal fluid duty is steady work. A coating line, a dyeing range, a plywood press or a herb drying room draws heat shift after shift, so the fuel line item dominates the running cost of the whole loop. In many regions biomass pellets and wood chips cost a fraction of light oil per unit of heat, and they are often available from local forestry, furniture and wood processing waste that would otherwise be dumped. Converting the heater to burn that material turns a recurring cost into a local supply chain, and for wood product plants it closes the loop completely: the offcuts and sander dust of the factory become the fuel of the press line.

Emission Pressure and Policy Direction

Coal fired thermal oil heaters face growing restrictions in industrial zones, and older oil fired units rarely meet the flue gas expectations that new projects face. Biomass is treated as a renewable fuel in most frameworks, and modern combustion chambers with staged air reach clean, stable combustion of pelletized fuel. The manufacturer describes the principle plainly: biomass particles as fuel turn waste into treasure, save energy, reduce emissions and meet current policy requirements. A conversion therefore solves two problems at once, the fuel bill and the compliance file.

What the YGL Design Brings to a Conversion Project

A Vertical Heater That Fits Existing Boiler Houses

Space is the first constraint in any retrofit, and the YGL answers it with a vertical layout. The transport footprint of the range runs from 840 by 1608 millimetres on the smallest model to 2250 by 3140 millimetres on the largest, with transport weights between 3000 and 6000 kilograms, so the unit passes through normal factory doors and sits on a modest foundation where the old heater stood. Installation is shortened by the split construction: during installation the upper body and the lower combustion chamber are simply closed together on site, which keeps the changeover window of a working plant short.

Closed Loop, Low Pressure, High Temperature

The YGL is a forced circulation boiler that burns biomass particles and carries heat in conduction oil. A circulation pump drives the oil through a liquid phase loop, heat is transferred to the consumers and the oil returns to the furnace for reheating. Because the system is a closed circulation that does not communicate with the atmosphere, the service life of the oil is prolonged, and because the coil only bears the pump pressure during operation there is no explosion risk from the heat conducting oil. The three return coil design with inner and outer densely packed coils gives sufficient heating surface at a low heat load on the pipe surface, the furnace top carries dense coils to avoid burnout of the furnace top, the combustion chamber is insulated for easy ignition and sufficient combustion, and technical compensation in the system copes with the volume change of the working medium as the temperature rises and falls. An economizer can be added on the flue to make the whole conversion more energy saving, and the medium reaches up to 340 degrees Celsius in liquid phase, which covers process heating in the 150 to 380 degree Celsius band without direct flame contact.

The Model Range at a Glance

All eight models share the same medium parameters: rated working pressure of 0.7 or 1.0 MPa, a rated working temperature of 290 to 320 degrees Celsius, a thermal efficiency of at least 83 percent and biomass as the design fuel. The table below lists the range with the circulation, heating surface and transport data needed for the layout check.

ModelRated heat power (10,000 kcal/h)Approx. output (MW)Circulation (m³/h)Heating area (m²)Medium volume in furnace (m³)Transport weight (kg)Transport size LxWxH (mm)
YGL-120SCIII100.1212.57.30.063,000840x1608
YGL-240SCIII200.232016.30.193,3001250x2080
YGL-350SCIII300.353022.40.263,6001350x2050
YGL-500SCIII400.474030.80.374,0001450x2300
YGL-700SCIII600.7060440.504,5001750x2680
YGL-1000SCIII800.938063.20.705,1001750x2990
YGL-1200SCIII1001.16100710.805,4002550x3030
YGL-140SCIII1201.4014087.61.056,0002250x3140

The range covers duties from a small single line up to roughly 1.4 MW. Plants whose converted duty sits above that band step up to the horizontal YLW biomass(coal) fired thermal fluid heater series, which carries the same thermal oil principle from 1.4 to 7.0 MW with biomass or coal, and both series can be quoted side by side so the buyer compares like with like.

Planning the Conversion: What to Keep and What to Replace

A conversion project is cheaper and faster when the survey separates what stays from what goes. The table below collects the items that appear in almost every thermal fluid retrofit.

Plant itemNormally keptNormally replaced or added
Consumers: jackets, platens, ovens, heat exchangersYes, the whole downstream loopOnly worn control valves
Oil circulation piping and insulationYes after a condition checkSections with heavy fouling or leaks
Circulation pumpsOften, if head and flow still matchPumps sized for the old heater only
Expansion tank and storageUsually, after a volume checkTanks too small for the new oil inventory
The heater itselfNoThe YGL unit, upper and lower body
Fuel pathNothing usablePellet silo, screw feeder, ash handling
Flue pathChimney often reusableEconomizer, dust collection, connection ducts
Control and monitoringLoop instruments where soundHeater control cabinet, cloud monitoring

Checking the Existing Loop

Start with the nameplate of the old heater and a written consumer list, then sample the oil in service. Oil that still passes viscosity, acid number, flash point and carbon residue tests can often be kept through the changeover, which saves a full charge. Measure the expansion tank free volume against the oil inventory of the new system, and confirm that the pump head still covers the most distant consumer once the new heater connection points are known. Plants that keep a short record of these checks finish the conversion inside a planned production stop instead of discovering surprises in the middle of it.

Fuel Store and Feeding Space

Biomass changes the logistics of the boiler house. Pellets need a dry silo or bag store with a screw or pneumatic feed to the hopper, wood chips need a larger bunker and an agitator, and every layout should keep the delivery path for a bulk truck clear. The vertical YGL leaves floor space around the heater that the old installation may not have had, and that space is best reserved for the fuel path and ash trolley rather than filled with stored goods. Plan weekly ash removal and a small dry ash bin next to the combustion chamber door.

Sizing the New Heater: A Four Step Method

Step 1: Collect the Existing Duty

The best number comes from the plant, not from the old nameplate. Read the average and peak oil temperatures and flow over several weeks if the old system has instruments, and walk the consumers to write down each design duty. Where records are thin, the rated output of the old heater plus a note of how often it ran at full fire gives a usable first estimate.

Step 2: Apply Diversity and a Margin

Consumers rarely peak together, so apply a diversity factor of 0.7 to 0.8 to the connected load of the consumers that will stay. Then add 10 to 15 percent for the warm up of cold oil after weekends, for fouling between cleaning windows and for the coldest design days when make up heating is highest.

Step 3: Choose the Model and the Duty Point

Select the standard model that carries the design duty at roughly 60 to 80 percent of rated output. A heater that lives at 95 percent load ages both the coil and the oil faster and leaves no room for a future line, while a heater that idles below half load wastes the investment.

Step 4: Verify Circulation and Expansion

Compare the circulation rate of the chosen model with the branch flows of the loop, size the expansion tank against the total oil volume including the longest pipe runs, and confirm the pump curve. The medium volume figures in the table above help with this check, because the new furnace volume replaces the old one in the balance.

Retrofit situationSurvey resultDesign point after marginCandidate model
Small coating line, old 0.35 MW coal heaterconnected 460 kW, diversified about 320 kWabout 370 kWYGL-500SCIII, 0.47 MW, near 78 percent load
Mid size dye house, old 0.6 MW oil heaterdiversified duty about 480 kWabout 550 kWYGL-700SCIII, 0.70 MW, near 79 percent load
Worked example below, old 0.8 MW heatermeasured simultaneous demand about 640 kWabout 740 kWYGL-1000SCIII, 0.93 MW, near 79 percent load
Two small old heaters replaced by one unitdiversified duty about 720 kWabout 830 kWYGL-1200SCIII, 1.16 MW, near 71 percent load

Worked Example: Replacing an 0.8 MW Coal Fired Heater

Take a plant whose old coal fired thermal oil heater is rated 800 kW and feeds a plywood press line and a drying room. The connected load of the consumers that stay is about 1000 kW, but records show the consumers never peak together, so a diversity factor of 0.7 puts the simultaneous duty near 640 kW, close to what the operators remember from the coal years. A 15 percent margin for warm up and fouling brings the design point to roughly 740 kW. The YGL-1000SCIII at 0.93 MW carries this at about 79 percent of rating, an efficient position that keeps reserve for one more drying room. The transport size of 1750 by 2990 millimetres fits the old foundation area, the pellet silo takes the corner where the coal bunker stood, and the changeover is planned into a weekend stop.

Fuel Choice and Running Cost After the Conversion

The design fuel is biomass, and in practice the choice is between pellets and dry chips. The figures below are planning values per megawatt hour of useful heat at the 83 percent design efficiency, so treat them as a comparison base and confirm them against local prices.

FuelApprox. calorific valueIndicative consumption per MWh of useful heat
Biomass pellets, dryabout 4.8 kWh per kgabout 250 kg
Dry wood chipsabout 3.6 kWh per kgabout 335 kg
Coalabout 6.9 kWh per kgabout 175 kg
Natural gasabout 9.7 kWh per Nm³about 124 Nm³
Light oilabout 11.9 kWh per kgabout 101 kg

For the worked example, 740 kW sustained over a 16 hour day is about 11.8 MWh of useful heat, which dry pellets meet with roughly three tonnes per day. Whether that beats gas or light oil depends entirely on local tariffs, but for plants with access to cheap pellet supply or with their own wood waste the running cost advantage is usually decisive. Keep the fuel store dry, because every point of moisture in the chips is heat that leaves through the chimney, and keep the feeding system clean so the screw does not bridge.

Customization, OEM and Drawing Based Development

Standard models cover most conversions, but retrofit sites are rarely standard. The engineering team accepts customized development from customer drawings, so the working pressure class, the outlet temperature, the fuel feeding arrangement for a specific silo, the economizer, the insulation and paint finish, the control integration with an existing SCADA system and the skid or layout around an odd foundation can all be engineered to the site. Buyers who build equipment under their own brand can discuss OEM cooperation with the factory, and export packing with container loading is routine. When the converted duty exceeds the YGL band, the same factory supplies the horizontal YLW biomass thermal fluid heater up to 7 MW, so a single supplier relationship covers both the small vertical unit today and the larger plant tomorrow.

Supplier Qualification and After Sales Service

A heater sits at the centre of production for twenty years, so the supplier check deserves the same care as the sizing. Hengxin Boiler records 40 years of factory history, a production area of 660,000 square metres, 580 million in total assets, 336 production machines, more than 300 models and a service team of over 500 people. The company works under the ISO9001 and ISO14001 management systems, holds the national special equipment production licence and is rated as a 3A credit enterprise; the full list of certificates can be reviewed on the honor and certificates page. Operation is supported by an intelligent boiler cloud platform that records load, alarms and service history, which is exactly the record a retrofit project needs for its compliance file. Service terms are concrete: technical consultation within 30 minutes, a clear plan within 2 hours, dispatch of engineers at home and abroad within 24 to 72 hours and free maintenance for 12 months since shipment. Delivery follows the transport weight of the order, with units under 15 tons in about 15 days, 15 to 25 tons in about 20 days and larger units in about 35 days, and some products are available from stock.

Frequently Asked Questions

Can the existing oil loop and consumers stay in place during the conversion?

In most projects yes. The consumers, the piping and often the pumps and expansion tank continue in service, and only the heater is swapped. The pre conversion survey should confirm the condition of the oil, the free volume of the expansion tank and the pump head, and the changeover is then planned into a short production stop. Where the old loop has heavy fouling or the tank is undersized for the new oil inventory, those items are renewed while the boiler house is already open.

How much biomass does an 0.93 MW YGL heater burn per day?

At the design efficiency of 83 percent, each megawatt hour of useful heat needs about 250 kilograms of dry pellets. A plant that draws an average of 740 kW over a 16 hour day therefore uses about three tonnes of pellets per day. Wood chips raise the mass but often lower the price per tonne, and the exact figures should always be checked with the moisture content of the fuel actually purchased.

What if the converted duty is larger than the YGL range?

The YGL range ends at 1.40 MW. Above that, the horizontal YLW chain grate biomass thermal fluid heater covers 1.4 to 7.0 MW with the same working principle, and two smaller vertical heaters running in parallel are sometimes the better answer when the load is split between buildings or production areas. Send the duty list to the engineering team and both options come back priced.

Does a biomass thermal fluid heater need special flue treatment?

Flue gas from biomass carries dust, so most projects add a cyclone or multi cyclone collector and, where the process justifies it, an economizer that cools the flue and preheats the combustion air. Chimney height and emission limits are set locally, so the flue design should be confirmed with the authorities early. The manufacturer supplies the dust collection and economizer options with the heater, which keeps responsibility for the whole flue path in one contract.

Request a Retrofit Assessment

Planning to retire a coal or oil fired thermal fluid heater? Review the complete specification of the YGL biomass(coal) fired thermal fluid heater, then send the nameplate of the old unit, the consumer list, the fuel space available and the local fuel prices. The engineering team will return a sized retrofit proposal with the model selection, the fuel consumption comparison, the layout suggestion and a delivery schedule matched to the production stop.

RECOMMENDED PRODUCTS

  • 1Rated Steam Capacity(t/h)0.5-6
  • 2Rated Working Pressure(MPa)1.25
  • 3Saturated Steam Temperature(℃))194
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Heat Power(MW)10-120
  • 2Rated Working Pressure(MPa)0.7-1.0
  • 3Max Working Temperature(℃))290/320
  • 4Design FuelBiomass Fuel
  • 1Rated Heat Power(MW)0.7-14
  • 2Rated Working Pressure(MPa)Atmospheric pressure
  • 3Rated Outlet/Return Temperature(℃))85/60
  • 4Design FuelNatural Gas,Light Oil,Heavy Oil etc.
  • 1Rated Heat Power(MW)0.35-7
  • 2Rated Working Pressure(MPa)1.0
  • 3Rated Outlet/Return Temperature(℃))115/70
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Heat Power(MW)0.35-14
  • 2Rated Working Pressure(MPa)0
  • 3Rated Outlet/Return Temperature(℃))85/60
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Steam Capacity(t/h)0.3-4
  • 2Rated Working Pressure(MPa)0.7-2.5
  • 3Saturated Steam Temperature(℃))151-171
  • 4Design FuelElectricity

Inquiry

Contact

Hengxin
Taikang Hengxin Boiler Co., Ltd. is located in Taikang County, Zhoukou City, Henan Province, the company was founded in 2016, is a specialized in boiler,pressure vessel products research and development, design, production, sales, installation, transformation and aseries of services. 7 years of development, Hengxin boiler has established a complete product line.The product line includes 8 kinds of oil and gas boiler, coal boiler, biomass boiler, hot blast stove, heat conductionoilboiler,electric boiler,waste heat boiler, circulating fluidized bed boiler,pressure vessel,28productseries,morethan 300models.Products cover agriculture,forestry,husbandryand fishery, food, textile, manufacturing, chemical, building materials, metallurgy and minerals, power supply and heating and many other industries. Hengxin Boiler,asone of the earliestenter prisesengaged in the boiler industry in China,was the first toobtain the B-classboiler manufacturing license issuedby the General Administration of Qua...
Get a free quote!
0.046447