A pulp molding plant turns waste paper into egg trays, fruit trays, cup carriers and industrial cushioning with nothing more exotic than water, a forming vacuum and heat. Yet the heat side decides whether the plant earns money. A drying tunnel that runs ten degrees cold slows the conveyor, the trays leave soft, and the stacker jams. A hot press without enough steam produces trays with a pale, weak surface that buyers reject. Because the forming line starts and stops with orders, and because the whole heat load sits in a compact building, the steam generator behind it has to be small, quick and steady. This article works through the duty in detail and shows how a tubular boiler, the vertical once through type often listed as an LSS boiler, fits a molded pulp plant better than most alternatives.

The numbers below suit a mid sized plant with six forming lines producing about 12,000 seventy gram egg trays per hour, which is a common configuration for suppliers serving poultry farms and supermarkets. Smaller plants can scale the same method down, and larger plants simply add modules.

Where the Steam Goes in a Pulp Molding Line

Before sizing anything, list every consumer of heat around the line. Pulp molding hides more heat users than newcomers expect, and the difference between a boiler that works and one that disappoints is usually a forgotten user rather than a wrong calculation.

Heat userWorking conditionsLoad characterEffect of a shortfall
Drying tunnel heating coils, six to ten zonesSteam 0.4 to 0.8 MPa, air 110 to 160 degrees Celsius zone by zoneContinuous, dominant load, 80 to 90 percent of the steamTrays leave above moisture target, soft edges, jams at stacking
Hot press or thermoforming platensSteam 0.8 to 1.0 MPa, platen surface 160 to 180 degrees CelsiusCyclic with the forming strokePale, weak hot press surface, higher reject rate
Pulping and stock preparation waterWarm water 30 to 40 degrees Celsius for faster repulping in winterSeasonal, moderateSlower fiber defibration, longer batch times
Mould cleaning and washing waterWarm water 50 to 60 degrees CelsiusIntermittentResin and fines build up on the forming screens
Workshop and office heatingRadiators or air unitsWinter, smallStaff comfort only, but it still loads the boiler

One boiler serves the whole list through a insulated header, with the drying tunnel taking priority and the smaller users trimming in around it. The layout is simple, which is one reason the steam route remains the default heat source for molded pulp despite the arrival of thermal oil and gas fired hot air options.

The Water Balance of a Moulded Tray

Everything about the sizing starts with water. Formed pulp leaves the vacuum forming stations carrying roughly two parts of water for every part of fiber, which is a moisture content near 67 percent on a wet basis. The finished tray must leave the tunnel at 8 percent or less, or the stack will grow mould in the warehouse and the compression test will fail. The tunnel therefore exists to evaporate almost the entire weight of what the forming machine produced, and the boiler must supply the heat for that evaporation hour after hour.

StageWhat happensTypical figures
Forming, vacuum dewateringFree water drawn off, web leaves the tool67 percent moisture wet basis, about 2 kg water per kg fiber
Hot press, where fittedPlatens squeeze and pre dry the trayMoisture down 5 to 10 points, surface compacted
Constant rate drying, tunnel frontSurface water evaporates freelyAir 130 to 160 degrees Celsius, most of the water removed here
Falling rate drying, tunnel rearWater diffuses from inside the fiber wallAir 110 to 130 degrees Celsius, slower, moisture to 6 to 8 percent
Cooling and stackingTrays stiffen and equalizeFinal moisture 6 to 8 percent

As a planning rule, a conventional tunnel without exhaust heat recovery consumes 3.0 to 3.6 kilograms of steam per kilogram of finished trays, and a tunnel fitted with air to air heat exchange on the exhaust drops that to 2.6 to 3.0. The rule is worth writing on the wall of the boiler house, because it turns a mystery into an audit: a plant that suddenly needs 4.5 kilograms of steam per kilogram of product has a fouled coil, a leaking trap or a door left open, long before the meter confirms it.

Why a Once Through Tubular Boiler Suits the Duty

The LSS type tubular boiler is a coil type once through steam generator. Feed water is pumped through a single long heating coil, passes the heating and evaporation sections, and leaves the collection headers as steam, with an external steam water separator polishing the quality. There is no drum, no large water volume and no natural circulation loop. Four consequences follow, and each one matches something a pulp molding plant needs.

Five minutes from cold to steam

Because the water content is small and the coil surface is thin, the boiler reaches operating pressure and full steam output within about five minutes of ignition. Molded pulp lines are batch businesses: an order finishes, the tunnel empties, the crew cleans screens and changes tools, and the next order starts. A drum boiler idles through those gaps losing heat up the stack, while a once through unit can be shut down between orders and back on the header before the first wet tray reaches zone three. Over a year of frequent restarts, that difference is visible on the gas bill.

A boiler house that fits beside the line

The largest model in the range measures 3.0 by 3.2 by 4.8 metres on its transport frame and needs no drum handling, no scaffold platform around a shell and no separate economizer floor. A plant can therefore put the boiler house on the narrow strip of floor that molded pulp plants actually have left, close to the tunnel inlet, which shortens the steam mains and their losses.

High efficiency at the loads the tunnel runs at

The published thermal efficiency is above 96.5 percent, helped by low flue gas exit temperature and the option of an extra condensing unit that adds about two points. Efficiency matters less at full load than at part load, and pulp molding lives at part load at night and between orders, where a fire tube boiler cycling on and off wastes purge air on every cycle.

Factory assembled and quick to commission

The unit ships fully assembled, burned in and equipped with water pump, oil pump, burner and control panel. On site the crew connects water, power, fuel, steam and blowdown lines and the boiler is ready for inspection. For a plant built in phases, that is the difference between a two day and a two week mechanical schedule.

Matching Steam Pressure to the Tunnel and the Press

Coil type boilers hold pressure well because there is little water to flash, but the selection still has to respect what the users need. Saturated steam tables are short and worth keeping at hand.

Steam pressureSaturation temperatureWhat it serves in a pulp plant
0.4 MPa151 degrees CelsiusRear tunnel zones, warm water heating
0.6 MPa165 degrees CelsiusMain drying coils, air at 130 to 150 degrees Celsius
0.8 MPa175 degrees CelsiusFront tunnel zones and hot press platens at 160 to 170 degrees Celsius surface
1.0 MPa184 degrees CelsiusCommon header for the whole plant, standard LSS rating
1.25 to 1.6 MPa194 to 204 degrees CelsiusReserve for high temperature platens and future lines, the LSS4.0 rating

A single header at 1.0 MPa with pressure reducing stations for the rear zones covers every user in the table, and the 1.6 MPa rating of the LSS4.0 leaves margin without over specifying the whole system.

Steam quality at the coils

Wet steam is the quiet enemy of a drying tunnel. Water carried over from the boiler or picked up in the mains collects in the coil bottoms, the zone controller sees a cold coil that is actually full of condensate, and the operator responds by raising the setpoint, which wastes fuel and accelerates fouling. The cure is unglamorous: a separator at the boiler outlet, which the LSS package already includes, correct pipe slopes, a drip leg and trap at every low point, and a strainer before each zone control valve. With those in place the tunnel receives dry steam and the zones track their setpoints within a degree or two.

The LSS Tubular Boiler Range

Four ratings cover the useful span for molded pulp plants, from a single line workshop to the six line example below. Figures come from the published specification page for the diesel oil, heavy oil and natural gas tubular boiler.

ItemLSS0.5LSS1.0LSS2.0LSS4.0
Rated output (t/h)0.51.02.04.0
Rated steam pressure (MPa)1.01.01.01.6
Steam temperature (degrees Celsius)184184184204
Feed water temperature (degrees Celsius)20202020
Burner controlHi Low OffHi Low OffHi Low OffHi Low Off
Thermal efficiencyAbove 96.5 percentAbove 96.5 percentAbove 96.5 percentAbove 96.5 percent
Natural gas (Nm3/h)3675148296
Diesel oil (kg/h)2958119238
Heavy oil (kg/h)3162125249
Main steam portDN40DN50DN65DN125
Electric power (kW)38915
Chimney diameter (mm)200200430580
Size L x W x H (m)2.1 x 1.6 x 2.12.3 x 2.0 x 3.02.5 x 2.3 x 3.13.0 x 3.2 x 4.8

The dual fuel and triple fuel capability is worth using deliberately rather than accepting passively. A plant near a reliable gas grid runs natural gas and enjoys the cleanest flue gas and the lowest maintenance. A plant in a region with frequent gas curtailment orders the dual fuel burner so diesel keeps the tunnel alive during outages, which for an export packing supplier can be the difference between shipping on time and paying penalties.

Sizing a Boiler in Four Steps

Step 1: build the water balance

Six lines at 12,000 trays per hour at seventy grams each give 840 kilograms of finished product per hour. At 8 percent final moisture the dry fiber is 773 kilograms. Formed web at 67 percent moisture carries 1,570 kilograms of water, so the tunnel evaporates about 1,500 kilograms of water per hour after the hot press has squeezed its share out.

Step 2: attach a specific heat consumption

Conventional pulp drying tunnels run at 3,000 to 3,300 kilojoules per kilogram of water evaporated once shell losses, exhaust carry over and leaks are counted; 3,100 is a fair planning value. That gives about 4,660 megajoules per hour, roughly 1,294 kilowatts at the tunnel.

Step 3: add the satellites, then diversity and margin

Hot press platens take 180 kilowatts during their strokes, pulping water heating 120, mould washing 40, workshop heating 70 and the feed water deaerator 30. The connected total is 1,734 kilowatts. The presses are intermittent and heating is seasonal, so a diversity factor of 0.85 is realistic, and a 10 percent margin covers fouled coils, cold feed water in winter and the day the plant adds a seventh line.

Step 4: convert to steam and select the model

At 1.0 MPa the latent heat of the steam is about 2,014 kilojoules per kilogram, and after allowing 3 percent for distribution losses the boiler must deliver about 2,994 kilograms of steam per hour, so just under three tonnes. The worked numbers are assembled below.

ItemBasisResult
Finished product12,000 trays per hour at 70 g840 kg/h
Water evaporated1,570 kg/h formed moisture minus 67 kg/h residual1,500 kg/h
Drying heat1,500 kg/h x 3,100 kJ/kg1,294 kW
Hot press platensSix presses, cyclic180 kW
Pulping, washing, heating, deaeratorWinter design260 kW
Connected load1,734 kW
Diversity at 0.851,734 x 0.851,474 kW
Margin at 10 percent1,474 x 1.101,621 kW design duty
Steam demand1,621 kW over 1,950 kJ/kg effective2,994 kg/h, about 3.0 t/h
Model selectedLSS4.0 at 4.0 t/hAbout 75 percent load in steady running

One Large Boiler or Two Smaller Ones

The sizing example leaves a real choice, and the right answer depends on how the plant sells its output rather than on the arithmetic alone.

ArrangementSteady load per unitStrengthWeakness
Single LSS4.0About 75 percentLowest first cost, one chimney and one water treatment train, simplest controlsNo steam while it is serviced, unless the plant can tolerate a cold tunnel
Two LSS2.0About 75 percent eachOne unit carries about two thirds of the load during the maintenance window of the other, spare parts sharedTwo burners and two stacks to maintain, higher installed cost
LSS4.0 plus LSS1.0Main at 75, summer at lowSmall unit covers night loads and holidays without cycling the large oneTwo control systems, more floor space

Plants running a single shift with real weekend gaps lean toward the single LSS4.0, because maintenance can be scheduled into the gaps. Plants that must never stop, for example those supplying a retailer with weekly delivery windows, usually buy two units of the same size for genuine interchangeability. Either way, the once through principle keeps the floor plan modest, since even the two unit arrangement fits in the space a drum boiler alone would need.

Fuel Consumption and Annual Figures

Dividing the rated fuel figures by the rated output gives the consumption per tonne of steam, which is the cleanest way to compare fuels and to check the fuel meter against the production meter.

FuelPer tonne of steamNote
Natural gas74 to 75 Nm3From 296 Nm3/h at 4.0 t/h, cleanest flue gas
Diesel oil59 to 60 kgFrom 238 kg/h at 4.0 t/h, standby or curtailment fuel
Heavy oil62 kgFrom 249 kg/h at 4.0 t/h, needs heating and better filtration

For the example plant, six thousand operating hours at an average 70 percent load means about 12,600 tonnes of steam a year, or 930,000 cubic metres of natural gas. At typical industrial gas prices the fuel bill dwarfs every other running cost of the boiler house, which is why the 96.5 percent efficiency, the fast restart behaviour and a working condensate return are not brochure points but money. Every tonne of condensate returned at 90 degrees Celsius saves roughly a sixth of the fuel that tonne of steam would otherwise need, and pulp plants return almost all of it because the coil condensate is clean and uncontaminated.

Installation Checklist for a Pulp Plant Boiler House

ItemPlanning value
Footprint, LSS4.0 with working spaceAbout 5 x 4 metres clear, headroom 5 metres for coil withdrawal
Feed water treatmentSoftener sized for full feed flow, hardness below 0.03 mmol/L, plus polish filter where the water is hard
Feed tank and deaeratorHold 1 hour of maximum evaporation, return condensate by gravity or pump with a surge pocket
Steam headerInsulated, crowned, drip legs and traps at every drop, separator at the boiler outlet
Condensate returnInsulated main back to the feed tank, check valves at each zone, conductivity monitor for coil leaks
Fuel trainGas train with double block and vent, or diesel day tank with filter and fire valve
Blowdown and chemical dosingOnce through boilers still need controlled blowdown and an oxygen scavenger programme
ElectricalOnly 15 kW for the LSS4.0 package, plus water treatment and lighting

Maintenance Calendar

IntervalTask
DailyBlow down the water level electrodes, test the low water cut off, log feed water hardness, walk the steam mains for leaking traps
WeeklyTest safety valve by lever, drain the steam water separator, check the burner flame picture and the gas pressure switches
MonthlyCompare fuel metered per tonne of steam against the table above, test the sequence for flame failure, clean the softener brine system
QuarterlyInspect the coil inlet headers for deposits, recalibrate pressure and level transmitters, exercise all isolation valves
AnnuallyFull burner service, hydrostatic test to code, internal inspection of headers, efficiency retest, review the water treatment programme with the supplier

Two items on this calendar carry more weight than the rest for a once through boiler. The first is feed water hardness, because a coil boiler has no drum where scale can settle harmlessly; hardness that would annoy a fire tube boiler for years will choke a coil in months. The second is the daily trap walk, because a tunnel fed by wet steam looks exactly like a tunnel fed by an undersized boiler, and the wrong diagnosis leads to buying capacity the plant does not need.

Five Mistakes That Cost New Plants Money

MistakeWhat it looks likePrevention
Sizing on the forming water instead of the evaporationBoiler rated from the vacuum pump and forming flows, tunnel starvedStart from the water balance of the tray, as in the four steps above
No condensate returnFuel bill ten to fifteen percent above plan, cold make up water all dayDesign the return main with the steam main, not as an afterthought
Wet steam at the coilsCold zones, raised setpoints, hammering at startupSeparator at the outlet, correct slopes, drip legs and traps
Untreated feed waterPressure falls short at full load within a season, coils scaleSoftener with daily hardness logging, chemical programme reviewed quarterly
One boiler with no service planTunnel cold during the annual inspection, orders slipTwo smaller units, or a service window agreed with the production calendar

Choosing the Supplier and the Specification

A coil type steam generator is a pressure vessel with a burner bolted to it, and the paperwork matters as much as the metalwork. Henan Hengxin Boiler Co., Ltd. works under the ISO9001 and ISO14001 management systems, holds the special equipment manufacturing licence for pressure boilers, and operates as an AAA credit enterprise with a track record of custom built units made to customer drawings for unusual fuels, voltages and layouts. The certificates are listed on the company honour page, and the paper processing application page shows where this product class already serves plants like yours.

When comparing quotations, ask each supplier for four things in writing: the guaranteed efficiency at 60 and at 100 percent load, the steam quality at the outlet separator, the guaranteed time from cold start to rated steam, and the feed water specification with the penalty that applies if the plant meets it and the boiler still scales. A manufacturer confident in its coil design answers all four without hesitation, and those answers predict ten years of operation better than any catalogue table.

FAQ

How much steam does one tonne of egg trays need?

Plan on 3.0 to 3.6 tonnes of steam per tonne of finished trays for a conventional drying tunnel without exhaust heat recovery, and 2.6 to 3.0 tonnes where the tunnel has air to air heat exchange on the exhaust. The exact figure depends on the forming moisture, the tunnel insulation and how disciplined the trap maintenance is, which is why the water balance should be calculated for the specific plant rather than borrowed.

Can a single tubular boiler serve the drying tunnel and the hot press?

Yes. The usual arrangement runs the header at 1.0 MPa and serves the rear tunnel zones and the warm water users through reducing stations, while the front zones and the hot press platens draw full pressure. The hot press duty is cyclic but small next to the tunnel, so it rides on the same boiler without a separate unit.

Why is feed water treatment so critical for a once through boiler?

There is no drum and no blowdown route for dissolved solids to leave the water side. Whatever enters the coil either leaves with the steam or stays behind as deposit, so the feed water specification, usually hardness below 0.03 mmol/L with an oxygen scavenger programme, must be treated as part of the boiler rather than as an accessory. Plants that log hardness daily rarely see coil problems, and plants that skip the log often meet them in the first year.

How fast does the boiler recover after the line stops?

From a standing start the unit reaches operating pressure and rated steam output within about five minutes of ignition, because the coil holds little water and heats through quickly. Between orders the unit can simply be shut down and restarted with the next batch, which avoids the standing losses a large water volume boiler incurs while idling.

Put the Water Balance on Paper First

Pulp molding is a business of small margins per tray, and the boiler is one of the few places where a single decision moves every tray. A correctly sized tubular boiler keeps the tunnel at temperature through the shift, restarts between orders without ceremony, and returns its condensate to cut the fuel bill year after year. Henan Hengxin Boiler Co., Ltd. supports the first step with application engineers who will turn your tray weight, line count and tunnel arrangement into a water balance and a boiler selection, and an OEM or custom specification follows the same route. Send the production figures and receive a proposal with sizing calculations, layout drawing and fuel economics within a few working days.

RECOMMENDED PRODUCTS

  • 1Rated Steam Capacity(t/h)4-20
  • 2Rated Working Pressure(MPa)1.25/2.5
  • 3Saturated Steam Temperature(℃))194-225
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Heat Power(MW)0.35-14
  • 2Rated Working Pressure(MPa)0
  • 3Rated Outlet/Return Temperature(℃))85/60
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Output(t/h)0.5-4.0
  • 2Rated Steam Pressure(MPa)1.0-1.6
  • 3Steam Temperature(℃))184-204
  • 4Apply FuelDiesel oil、Heavyoil、 Natural gas
  • 1Rated Steam Capacity(t/h)0.5-10
  • 2Rated Working Pressure(MPa)1.25
  • 3Saturated Steam Temperature(℃))194
  • 4Design FuelCoal Biomass Fuel
  • 1Rated Steam Capacity(t/h)6-150
  • 2Rated Working Pressure(MPa)1.25-2.5
  • 3Saturated Steam Temperature(℃))194-225
  • 4Design FuelNatural Gas,Light Oil,Heavy Oil etc.
  • 1Rated Steam Capacity0.1t/h-1.0t/h
  • 2Rated Working Pressure0.4MPa-0.7MPa
  • 3Saturated Steam Temperature151℃-171℃
  • 4Design FuelElectricity

Inquiry

Contact

Hengxin
Taikang Hengxin Boiler Co., Ltd. is located in Taikang County, Zhoukou City, Henan Province, the company was founded in 2016, is a specialized in boiler,pressure vessel products research and development, design, production, sales, installation, transformation and aseries of services. 7 years of development, Hengxin boiler has established a complete product line.The product line includes 8 kinds of oil and gas boiler, coal boiler, biomass boiler, hot blast stove, heat conductionoilboiler,electric boiler,waste heat boiler, circulating fluidized bed boiler,pressure vessel,28productseries,morethan 300models.Products cover agriculture,forestry,husbandryand fishery, food, textile, manufacturing, chemical, building materials, metallurgy and minerals, power supply and heating and many other industries. Hengxin Boiler,asone of the earliestenter prisesengaged in the boiler industry in China,was the first toobtain the B-classboiler manufacturing license issuedby the General Administration of Qua...